UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549



FORM 10-Q



(Mark One)

ý

 

QUARTERLY REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934

 

 

For the quarterly period ended June 30, 2011

o

 

TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934

 

 

For the transition period from                         to                          

Commission File Number 1-9936



EDISON INTERNATIONAL
(Exact name of registrant as specified in its charter)



California   95-4137452
(State or other jurisdiction of
incorporation or organization)
  (I.R.S. Employer
Identification No.)

2244 Walnut Grove Avenue
(P. O. Box 976)
Rosemead, California

 



91770
(Address of principal executive offices)   (Zip Code)

(626) 302-2222
(Registrant's telephone number, including area code)



Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days. Yes ý No o

Indicate by check mark whether the registrant has submitted electronically and posted on its corporate Web site, if any, every Interactive Data File required to be submitted and posted pursuant to Rule 405 of Regulation S-T during the preceding 12 months (or for such shorter period that the registrant was required to submit and post such files). Yes ý No o

Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, or a smaller reporting company. See the definitions of "large accelerated filer," "accelerated filer" and "smaller reporting company" in Rule 12b-2 of the Exchange Act.

Large accelerated filer ý   Accelerated filer o   Non-accelerated filer o
(Do not check if a smaller reporting company)
  Smaller reporting company o

Indicate by check mark whether the registrant is a shell company (as defined in Rule 12b-2 of the Exchange Act). Yes o No ý

Indicate the number of shares outstanding of each of the issuer's classes of common stock, as of the latest practicable date:

Class   Outstanding at August 1, 2011
Common Stock, no par value   325,811,206


Table of Contents


TABLE OF CONTENTS

GLOSSARY

  v

PART I. FINANCIAL INFORMATION

ITEM 1. FINANCIAL STATEMENTS

 
1
 

Consolidated Statements of Income

 
1
 

Consolidated Statements of Comprehensive Income

 
2
 

Consolidated Balance Sheets

 
3
 

Consolidated Statements of Cash Flows

 
5

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS

 
7
 

Note 1. Summary of Significant Accounting Policies

 
7
 

Note 2. Consolidated Statements of Changes in Equity

 
9
 

Note 3. Variable Interest Entities

 
10
 

Note 4. Fair Value Measurements

 
12
 

Note 5. Debt and Credit Agreements

 
17
 

Note 6. Derivative Instruments and Hedging Activities

 
18
 

Note 7. Income Taxes

 
25
 

Note 8. Compensation and Benefit Plans

 
26
 

Note 9. Commitments and Contingencies

 
29
 

Note 10. Regulatory and Environmental Developments

 
35
 

Note 11. Accumulated Other Comprehensive Loss

 
37
 

Note 12. Supplemental Cash Flows Information

 
38
 

Note 13. Preferred and Preference Stock of Utility

 
38
 

Note 14. Regulatory Assets and Liabilities

 
39
 

Note 15. Other Investments

 
39
 

Note 16. Other Income and Expenses

 
40
 

Note 17. Business Segments

 
41

ITEM 2. MANAGEMENT'S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS

 
42

FORWARD-LOOKING STATEMENTS

 
42

EDISON INTERNATIONAL MANAGEMENT OVERVIEW

 

Highlights of Operating Results

 
44
 

Management Overview of SCE

 
45
   

Capital Program

 
45
   

2012 CPUC General Rate Case

 
45
   

FERC Formula Rates

 
46
   

Nuclear Industry and Regulatory Response to Events in Japan

 
46
 

Management Overview of EMG

 
46

i


Table of Contents

 

Cross-State Air Pollution Rule

  46
 

Homer City Capital Needs

 
47
 

Midwest Generation Environmental Compliance Plans and Costs

 
48
   

Walnut Creek Project

 
48
 

Environmental Regulation Developments

 
48

SOUTHERN CALIFORNIA EDISON COMPANY

RESULTS OF OPERATIONS

 
49
 

Three Months Ended June 30, 2011 versus June 30, 2010

 
49
   

Utility Earning Activities

 
50
   

Utility Cost-Recovery Activities

 
50
 

Six Months Ended June 30, 2011 versus June 30, 2010

 
51
   

Utility Earning Activities

 
51
   

Utility Cost-Recovery Activities

 
52
 

Supplemental Operating Revenue Information

 
52
 

Income Taxes

 
53

LIQUIDITY AND CAPITAL RESOURCES

 
53
 

Available Liquidity

 
53
   

Debt Covenant

 
54
 

Dividend Restrictions

 
54
 

Margin and Collateral Deposits

 
54
   

Workers Compensation Self-Insurance Fund

 
54
 

Historical Consolidated Cash Flows

 
55
   

Condensed Consolidated Statement of Cash Flows

 
55
     

Net Cash Provided by Operating Activities

  55
     

Net Cash Provided by Financing Activities

  55
     

Net Cash Used by Investing Activities

  56
 

Contractual Obligations and Contingencies

 
56
   

Contractual Obligations

 
56
   

Contingencies

 
56
     

Environmental Remediation

  56

MARKET RISK EXPOSURES

 
56
 

Commodity Price Risk

 
56
 

Credit Risk

 
56

EDISON MISSION GROUP

RESULTS OF OPERATIONS

 
58
 

Results of Continuing Operations

 
58
   

Adjusted Operating Income ("AOI")—Overview

 
59
   

Adjusted Operating Income from Consolidated Operations

 
61
     

Midwest Generation Plants

  61
     

Homer City

  62

ii


Table of Contents

     

Seasonality—Coal Plants

  63
     

Renewable Energy Projects

  63
     

Energy Trading

  63
   

Adjusted Operating Income from Unconsolidated Affiliates

 
64
   

Interest Expense

 
64
   

Income Taxes

 
65

LIQUIDITY AND CAPITAL RESOURCES

 
65
 

Available Liquidity

 
65
   

Homer City Outage

 
66
 

Capital Investment Plan

 
67
   

Environmental Capital Expenditures

 
67
   

Plant Capital Expenditures

 
67
   

Funding of Capital Expenditures

 
68
   

Renewable Energy Projects

 
68
 

Historical Segment Cash Flows

 
68
   

Condensed Statement of Cash Flows

 
68
     

Net Cash Provided by Operating Activities

  68
     

Net Cash Provided by Financing Activities

  68
     

Net Cash Provided by Investing Activities

  69
 

Credit Ratings

 
69
   

Overview

 
69
   

Credit Rating of EMMT

 
69
 

Margin, Collateral Deposits and Other Credit Support for Energy Contracts

 
69
 

Debt Covenants and Dividend Restrictions

 
70
   

Credit Facility Financial Ratios

 
70
   

Key Ratios of EMG's Principal Subsidiaries Affecting Dividends

 
70
   

EME's Senior Notes and Guaranty of Powerton-Joliet Leases

 
70
 

Contractual Obligations and Contingencies

 
71
   

Fuel Supply Contracts

 
71
   

Capital Expenditures

 
71
   

Midwest Generation New Source Review and Other Litigation

 
71
   

Homer City New Source Review and Other Litigation

 
71
 

Off-Balance Sheet Transactions

 
71

MARKET RISK EXPOSURES

 
71
 

Derivative Instruments

 
71
   

Unrealized Gains and Losses

 
71
   

Fair Value Disclosures

 
71
 

Commodity Price Risk

 
72
   

Energy Price Risk

 
72
   

Capacity Price Risk

 
73
   

Basis Risk

 
74

iii


Table of Contents

   

Coal and Transportation Price Risk

  74
   

Emission Allowances Price Risk

 
74
 

Credit Risk

 
75
 

Interest Rate Risk

 
76

EDISON INTERNATIONAL PARENT AND OTHER

RESULTS OF OPERATIONS

 
77

LIQUIDITY AND CAPITAL RESOURCES

 
77
 

Historical Cash Flows

 
77
   

Condensed Statement of Cash Flows

 
77
     

Net Cash Used by Operating Activities

  78
     

Net Cash Provided (Used) by Financing Activities

  78

EDISON INTERNATIONAL (CONSOLIDATED)

LIQUIDITY AND CAPITAL RESOURCES

 
79
 

Contractual Obligations

 
79

CRITICAL ACCOUNTING ESTIMATES AND POLICIES

 
79

NEW ACCOUNTING GUIDANCE

 
79

ITEM 3. QUANTITATIVE AND QUALITATIVE DISCLOSURES ABOUT MARKET RISK

 
79

ITEM 4. CONTROLS AND PROCEDURES

 
79
 

Disclosure Controls and Procedures

 
79

PART II. OTHER INFORMATION

ITEM 1. LEGAL PROCEEDINGS

 
79
 

California Coastal Commission Potential Environmental Proceeding

 
79
 

Navajo Nation Litigation

 
80
 

Midwest Generation New Source Review and Other Litigation

 
80
 

Homer City New Source Review and Other Litigation

 
80

ITEM 2. UNREGISTERED SALES OF EQUITY SECURITIES AND USE OF PROCEEDS

 
80
 

Purchases of Equity Securities by the Issuer and Affiliated Purchasers

 
80

ITEM 6. EXHIBITS

 
81

SIGNATURE

 
82

iv


Table of Contents


GLOSSARY

The following terms and abbreviations appearing in the text of this report have the meanings indicated below.

2010 Form 10-K   Edison International's Annual Report on Form 10-K for the year-ended December 31, 2010
2010 Tax Relief Act   Tax Relief, Unemployment Insurance Reauthorization and Job Creation Act
of 2010
AFUDC   allowance for funds used during construction
Ambit project   American Bituminous Power Partners, L.P.
AOI   Adjusted Operating Income (Loss)
APS   Arizona Public Service Company
ARO(s)   asset retirement obligation(s)
BACT   best available control technology
BART   best available retrofit technology
Bcf   billion cubic feet
Big 4   Kern River, Midway-Sunset, Sycamore and Watson natural gas power projects
Btu   British thermal units
CAA   Clean Air Act
CAIR   Clean Air Interstate Rule
CAISO   California Independent System Operator
CAMR   Clean Air Mercury Rule
CARB   California Air Resources Board
CDWR   California Department of Water Resources
CEC   California Energy Commission
coal plants   Midwest Generation coal plants and Homer City plant
Commonwealth Edison   Commonwealth Edison Company
CPS   Combined Pollutant Standard
CPUC   California Public Utilities Commission
CSAPR   Cross-State Air Pollution Rule
CRRs   congestion revenue rights
DOE   U.S. Department of Energy
EME   Edison Mission Energy
EMG   Edison Mission Group Inc.
EMMT   Edison Mission Marketing & Trading, Inc.
EPS   earnings per share
ERRA   energy resource recovery account
EWG   Exempt Wholesale Generator
Exelon Generation   Exelon Generation Company LLC
FASB   Financial Accounting Standards Board
FERC   Federal Energy Regulatory Commission
FGIC   Financial Guarantee Insurance Company
FIP(s)   federal implementation plan(s)
Four Corners   coal fueled electric generating facility located in Farmington, New Mexico in
which SCE holds a 48% ownership interest
GAAP   generally accepted accounting principles
GHG   greenhouse gas
Global Settlement   A settlement between Edison International and the IRS that resolved federal tax disputes related to Edison Capital's cross-border, leveraged leases through 2009, and all other outstanding federal tax disputes and affirmative claims for tax years 1986 through 2002 and related matters with state tax authorities.
GRC   general rate case
GWh   gigawatt-hours
Homer City   EME Homer City Generation L.P., a Pennsylvania limited partnership that leases and operates three coal-fired electric generating units and related facilities located in Indiana County, Pennsylvania

v


Table of Contents

Illinois EPA   Illinois Environmental Protection Agency
IRS   Internal Revenue Service
ISO   Independent System Operator
kWh(s)   kilowatt-hour(s)
LIBOR   London Interbank Offered Rate
MD&A   Management's Discussion and Analysis of Financial Condition and Results
of Operations in this report
Midwest Generation   Midwest Generation, LLC
Midwest Generation plants   EME's power plants (fossil fuel) located in Illinois
MMBtu   million British thermal units
Mohave   two coal fueled electric generating facilities that no longer operate located
in Clark County, Nevada in which SCE holds a 56% ownership interest
Moody's   Moody's Investors Service
MRTU   Market Redesign and Technology Upgrade
MW   megawatts
MWh   megawatt-hours
NAAQS   national ambient air quality standards
NAPP   Northern Appalachian
NERC   North American Electric Reliability Corporation
Ninth Circuit   U.S. Court of Appeals for the Ninth Circuit
NOV   notice of violation
NOx   nitrogen oxide
NRC   Nuclear Regulatory Commission
NSR   New Source Review
NYISO   New York Independent System Operator
PADEP   Pennsylvania Department of Environmental Protection
Palo Verde   large pressurized water nuclear electric generating facility located near
Phoenix, Arizona in which SCE holds a 15.8% ownership interest
PBOP(s)   postretirement benefits other than pension(s)
PBR   performance-based ratemaking
PG&E   Pacific Gas & Electric Company
PJM   PJM Interconnection, LLC
PRB   Powder River Basin
PSD   Prevention of Significant Deterioration
QF(s)   qualifying facility(ies)
ROE   return on equity
RPM   Reliability Pricing Model
RTO(s)   Regional Transmission Organization(s)
S&P   Standard & Poor's Ratings Services
San Onofre   large pressurized water nuclear electric generating facility located in south
San Clemente, California in which SCE holds a 78.21% ownership interest
SCE   Southern California Edison Company
SNCR   selective non-catalytic reduction
SDG&E   San Diego Gas & Electric
SEC   U.S. Securities and Exchange Commission
SIP(s)   state implementation plan(s)
SO2   sulfur dioxide
US EPA   U.S. Environmental Protection Agency
VIE(s)   variable interest entity(ies)
year-ended 2010 MD&A   Management's Discussion and Analysis of Financial Condition and Results
of Operations appearing in the 2010 Form 10-K
 

vi


Table of Contents


PART I. FINANCIAL INFORMATION

ITEM 1. FINANCIAL STATEMENTS

   
Consolidated Statements of Income
  Edison International
 
 
 

Three months ended
June 30,
  Six months ended
June 30,
 
(in millions, except per-share amounts, unaudited)
  2011
  2010
  2011
  2010
 
   

Electric utility

  $ 2,445   $ 2,246   $ 4,676   $ 4,405  

Competitive power generation

    538     495     1,090     1,147  
       

Total operating revenue

    2,983     2,741     5,766     5,552  
       

Fuel

    256     254     515     549  

Purchased power

    649     612     1,158     1,220  

Operations and maintenance

    1,263     1,144     2,412     2,183  

Depreciation, decommissioning and amortization

    435     380     852     749  
       

Total operating expenses

    2,603     2,390     4,937     4,701  
       

Operating income

    380     351     829     851  

Interest and dividend income

    30     4     34     23  

Equity in income from unconsolidated affiliates – net

    18     20     12     39  

Other income

    42     36     83     70  

Interest expense

    (203 )   (175 )   (398 )   (343 )

Other expenses

    (13 )   (16 )   (25 )   (28 )
       

Income from continuing operations before income taxes

    254     220     535     612  

Income tax expense (benefit)

    62     (136 )   127     14  
       

Income from continuing operations

    192     356     408     598  

Income (loss) from discontinued operations – net of tax

    (1 )   1     (3 )   8  
       

Net income

    191     357     405     606  

Dividends on preferred and preference stock of utility

    15     13     29     26  
       

Net income attributable to Edison International common shareholders

  $ 176   $ 344   $ 376   $ 580  
       

Amounts attributable to Edison International common shareholders:

                         

Income from continuing operations, net of tax

  $ 177   $ 343   $ 379   $ 572  

Income (loss) from discontinued operations, net of tax

    (1 )   1     (3 )   8  
       

Net income attributable to Edison International common shareholders

  $ 176   $ 344   $ 376   $ 580  
       

Basic earnings per common share attributable to Edison International common shareholders:

                         

Weighted-average shares of common stock outstanding

    326     326     326     326  

Continuing operations

  $ 0.54   $ 1.05   $ 1.16   $ 1.75  

Discontinued operations

            (0.01 )   0.02  
       

Total

  $ 0.54   $ 1.05   $ 1.15   $ 1.77  
       

Diluted earnings per common share attributable to Edison International common shareholders:

                         

Weighted-average shares of common stock outstanding, including effect of dilutive securities

    329     327     328     327  

Continuing operations

  $ 0.54   $ 1.05   $ 1.16   $ 1.75  

Discontinued operations

            (0.01 )   0.02  
       

Total

  $ 0.54   $ 1.05   $ 1.15   $ 1.77  
       

Dividends declared per common share

  $ 0.320   $ 0.315   $ 0.640   $ 0.630  
   

The accompanying notes are an integral part of these consolidated financial statements.

1


Table of Contents

   
Consolidated Statements of Comprehensive Income
  Edison International
 
 
 

Three months ended
June 30,
 

Six months ended
June 30,
 
(in millions, unaudited)
  2011
  2010
  2011
  2010
 
   

Net income

  $ 191   $ 357   $ 405   $ 606  
       

Other comprehensive loss, net of tax:

                         
 

Pension and postretirement benefits other than pensions:

                         
   

Net gain arising during the period, net of income tax expense of $2 for the six months ended June 30, 2010

                12  
   

Amortization of net (gain) loss included in net income, net of income tax expense (benefit) of $1 and $1 for the three months and $3 and $(4) for the six months ended June 30, 2011 and 2010, respectively

    1     2     4     (6 )
   

Prior service credit arising during the period, net of income tax expense of $1 for the six months ended June 30, 2010

                2  
   

Amortization of prior service credit, net of income tax benefit of $1 for the six months ended June 30, 2010

                (2 )
 

Unrealized gain (loss) on derivatives qualified as cash flow hedges:

                         
   

Unrealized holding gain (loss) arising during the period, net of income tax expense (benefit) of $(9) and $(50) for the three months and $(5) and $12 for the six months ended June 30, 2011 and 2010, respectively

    (14 )   (77 )   (8 )   18  
   

Reclassification adjustments included in net income, net of income tax benefit of $6 and $35 for the three months and $12 and $49 for the six months ended June 30, 2011 and 2010, respectively

    (7 )   (53 )   (17 )   (73 )
       

Other comprehensive loss

    (20 )   (128 )   (21 )   (49 )
       

Comprehensive income

    171     229     384     557  

Less: Comprehensive income attributable to noncontrolling interests

    15     13     29     26  
       

Comprehensive income attributable to Edison International

  $ 156   $ 216   $ 355   $ 531  
   

The accompanying notes are an integral part of these consolidated financial statements.

2


Table of Contents

   
Consolidated Balance Sheets
  Edison International
 



(in millions, unaudited)

  June 30,
2011

  December 31,
2010

 
   

ASSETS

             

Cash and cash equivalents

  $ 945   $ 1,389  

Receivables, less allowances of $87 and $85 for uncollectible accounts at respective dates

    1,018     931  

Accrued unbilled revenue

    619     442  

Inventory

    589     568  

Prepaid taxes

    356     390  

Derivative assets

    117     133  

Restricted cash

    11     2  

Margin and collateral deposits

    65     65  

Regulatory assets

    469     378  

Other current assets

    148     124  
       

Total current assets

    4,337     4,422  
       

Nuclear decommissioning trusts

    3,657     3,480  

Investments in unconsolidated affiliates

    552     559  

Other investments

    231     223  
       

Total investments

    4,440     4,262  
       

Utility property, plant and equipment, less accumulated depreciation of $6,486 and $6,319 at respective dates

    25,847     24,778  

Competitive power generation and other property, plant and equipment, less accumulated depreciation of $2,009 and $1,865 at respective dates

    5,613     5,406  
       

Total property, plant and equipment

    31,460     30,184  
       

Derivative assets

    242     437  

Restricted deposits

    27     47  

Rent payments in excess of levelized rent expense under plant operating leases

    1,288     1,187  

Regulatory assets

    4,690     4,347  

Other long-term assets

    591     644  
       

Total long-term assets

    6,838     6,662  
       

             

             

             

Total assets

 
$

47,075
 
$

45,530
 
   

The accompanying notes are an integral part of these consolidated financial statements.

3


Table of Contents

   
Edison International
 
Consolidated Balance Sheets
   
   
 



(in millions, except share amounts, unaudited)

  June 30,
2011

  December 31,
2010

 
   

LIABILITIES AND EQUITY

             

Short-term debt

  $ 388   $ 115  

Current portion of long-term debt

    53     48  

Accounts payable

    1,110     1,362  

Accrued taxes

    33     52  

Accrued interest

    225     205  

Customer deposits

    208     217  

Derivative liabilities

    238     217  

Regulatory liabilities

    820     738  

Other current liabilities

    807     998  
       

Total current liabilities

    3,882     3,952  
       

Long-term debt

    12,956     12,371  
       

Deferred income taxes

    5,819     5,625  

Deferred investment tax credits

    132     122  

Customer advances

    121     112  

Derivative liabilities

    580     468  

Pensions and benefits

    2,306     2,260  

Asset retirement obligations

    2,616     2,561  

Regulatory liabilities

    4,759     4,524  

Other deferred credits and other long-term liabilities

    2,147     2,041  
       

Total deferred credits and other liabilities

    18,480     17,713  
       

Total liabilities

    35,318     34,036  
       

Commitments and contingencies (Note 9)

             

Common stock, no par value (800,000,000 shares authorized; 325,811,206 shares issued and outstanding at each date)

    2,347     2,331  

Accumulated other comprehensive loss

    (97 )   (76 )

Retained earnings

    8,476     8,328  
       

Total Edison International's common shareholders' equity

    10,726     10,583  
       

Preferred and preference stock of utility

    1,029     907  

Other noncontrolling interests

    2     4  
       

Total noncontrolling interests

    1,031     911  
       

Total equity

    11,757     11,494  
       

Total liabilities and equity

  $ 47,075   $ 45,530  
   

The accompanying notes are an integral part of these consolidated financial statements.

4


Table of Contents

   
Consolidated Statements of Cash Flows
  Edison International
 
 
 

Six months ended
June 30,
 
(in millions, unaudited)
  2011
  2010
 
   

Cash flows from operating activities:

             

Net income

  $ 405   $ 606  

Less: Income (loss) from discontinued operations

    (3 )   8  
       

Income from continuing operations

    408     598  

Adjustments to reconcile to net cash provided by operating activities:

             

Depreciation, decommissioning and amortization

    852     749  

Regulatory impacts of net nuclear decommissioning trust earnings (reflected in accumulated depreciation)

    75     74  

Other amortization

    75     56  

Stock-based compensation

    15     14  

Equity in income from unconsolidated affiliates – net

    (12 )   (39 )

Distributions from unconsolidated entities

    15     39  

Deferred income taxes and investment tax credits

    223     247  

Proceeds from U.S. treasury grants

        92  

Income from leveraged leases

    (3 )   (2 )

Changes in operating assets and liabilities:

             
 

Receivables

    64     13  
 

Inventory

    (21 )   (36 )
 

Margin and collateral deposits – net of collateral received

    1     12  
 

Prepaid taxes

    34     (167 )
 

Other current assets

    (189 )   (136 )
 

Rent payments in excess of levelized rent expense

    (101 )   (111 )
 

Accounts payable

    66     (114 )
 

Accrued taxes

    (19 )   (69 )
 

Other current liabilities

    (212 )   (164 )
 

Derivative assets and liabilities – net

    303     806  
 

Regulatory assets and liabilities – net

    (260 )   (720 )
 

Other assets

    (31 )   (36 )
 

Other liabilities

    (58 )   (152 )

Operating cash flows from discontinued operations

    (3 )   8  
       

Net cash provided by operating activities

    1,222     962  
       

Cash flows from financing activities:

             

Long-term debt issued

    592     645  

Long-term debt issuance costs

    (5 )   (19 )

Long-term debt repaid

    (30 )   (366 )

Bonds purchased

    (56 )    

Preference stock issued – net

    123      

Short-term debt financing – net

    292     410  

Settlements of stock-based compensation – net

    (13 )   (2 )

Dividends and distributions to noncontrolling interests

    (28 )   (25 )

Dividends paid

    (209 )   (205 )
       

Net cash provided by financing activities

  $ 666   $ 438  
   

The accompanying notes are an integral part of these consolidated financial statements.

5


Table of Contents

   
Edison International
 
Consolidated Statements of Cash Flows
   
   
 
 
 

Six months ended
June 30,
 
(in millions, unaudited)
  2011
  2010
 
   

Cash flows from investing activities:

             

Capital expenditures

  $ (2,256 ) $ (2,070 )

Purchase of interest in acquired companies

        (4 )

Proceeds from sale of nuclear decommissioning trust investments

    1,146     600  

Purchases of nuclear decommissioning trust investments and other

    (1,230 )   (697 )

Proceeds from partnerships and unconsolidated subsidiaries, net of investment

    5     44  

Investments in other assets

    3     13  

Effect of consolidation and deconsolidation of variable interest entities

        (91 )
       

Net cash used by investing activities

    (2,332 )   (2,205 )
       

Net decrease in cash and cash equivalents

    (444 )   (805 )

Cash and cash equivalents, beginning of period

    1,389     1,673  
       

Cash and cash equivalents, end of period

  $ 945   $ 868  
   

The accompanying notes are an integral part of these consolidated financial statements.

6


Table of Contents


NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
(Unaudited)

Note 1. Summary of Significant Accounting Policies

Edison International has two business segments for financial reporting purposes: an electric utility operation segment (SCE) and a competitive power generation segment (EMG). SCE is an investor-owned public utility primarily engaged in the business of supplying electricity to an approximately 50,000 square mile area of southern California. EMG is the holding company for its principal wholly owned subsidiary, EME. EME is a holding company with subsidiaries and affiliates engaged in the business of developing, acquiring, owning or leasing, operating and selling energy and capacity from independent power production facilities. EME also engages in hedging and energy trading activities in competitive power markets through its Edison Mission Marketing & Trading, Inc. ("EMMT") subsidiary.

Basis of Presentation

Edison International's significant accounting policies were described in Note 1 of "Edison International Notes to Consolidated Financial Statements" included in the 2010 Form 10-K. Edison International follows the same accounting policies for interim reporting purposes, with the exception of accounting principles adopted as of January 1, 2011, discussed below in "—New Accounting Guidance." This quarterly report should be read in conjunction with the financial statements and notes included in the 2010 Form 10-K.

In the opinion of management, all adjustments, including recurring accruals, have been made that are necessary to fairly state the consolidated financial position, results of operations and cash flows in accordance with accounting principles generally accepted in the United States of America ("GAAP") for the periods covered by this quarterly report on Form 10-Q. The results of operations for the three- and six-month periods ended June 30, 2011 are not necessarily indicative of the operating results for the full year.

The December 31, 2010 condensed consolidated balance sheet data was derived from audited financial statements, but does not include all disclosures required by GAAP.

Cash Equivalents

Cash equivalents included investments in money market funds totaling $743 million and $1.1 billion at June 30, 2011 and December 31, 2010, respectively. Generally, the carrying value of cash equivalents equals the fair value, as all investments have maturities of three months or less.

Edison International temporarily invests the ending daily cash balance in its primary disbursement accounts until required for check clearing. Edison International reclassified $185 million and $197 million of checks issued against these accounts, but not yet paid by the financial institution, from cash to accounts payable at June 30, 2011 and December 31, 2010, respectively.

Inventory

Inventory is stated at the lower of cost or market, cost being determined by the weighted-average cost method for fuel, and the average cost method for materials and supplies. Inventory consisted of the following:

(in millions)
  June 30,
2011

  December 31,
2010

 
   

Coal, gas, fuel oil and other raw materials

  $ 203   $ 184  

Spare parts, materials and supplies

    386     384  
       

Total inventory

  $ 589   $ 568  
   

Earnings Per Share

Edison International computes earnings per share ("EPS") using the two-class method, which is an earnings allocation formula that determines EPS for each class of common stock and participating security. Edison

7


Table of Contents


International's participating securities are stock-based compensation awards payable in common shares, including stock options, performance shares and restricted stock units, which earn dividend equivalents on an equal basis with common shares. Stock options awarded during the period 2003 through 2006 received dividend equivalents. EPS attributable to Edison International common shareholders was computed as follows:

 
  Three months ended
June 30,
  Six months ended
June 30,
 
(in millions)
  2011
  2010
  2011
  2010
 
   

Basic earnings per share – continuing operations:

                         

Income from continuing operations attributable to common shareholders, net of tax

  $ 177   $ 343   $ 379   $ 572  

Participating securities dividends

        (2 )       (2 )
       

Income from continuing operations available to common shareholders

  $ 177   $ 341   $ 379   $ 570  

Weighted average common shares outstanding

    326     326     326     326  
       

Basic earnings per share – continuing operations

  $ 0.54   $ 1.05   $ 1.16   $ 1.75  
       

Diluted earnings per share – continuing operations:

                         

Income from continuing operations available to common shareholders

  $ 177   $ 341   $ 379   $ 570  

Income impact of assumed conversions

    1     1     1     1  
       

Income from continuing operations available to common shareholders and assumed conversions

  $ 178   $ 342   $ 380   $ 571  

Weighted average common shares outstanding

    326     326     326     326  

Incremental shares from assumed conversions

    3     1     2     1  
       

Adjusted weighted average shares – diluted

    329     327     328     327  

Diluted earnings per share – continuing operations

  $ 0.54   $ 1.05   $ 1.16   $ 1.75  
   

Stock-based compensation awards to purchase 5,896,940 and 9,645,334 shares of common stock for the three months ended June 30, 2011 and 2010, respectively, and 5,896,940 and 6,080,199 shares of common stock for the six months ended June 30, 2011 and 2010 respectively, were outstanding, but were not included in the computation of diluted earnings per share because the exercise price of the awards was greater than the average market price of the common shares during the respective periods and, therefore, the effect would have been antidilutive.

New Accounting Guidance

Accounting Guidance Adopted in 2011

Revenue—Multiple-Deliverables

In October 2009, the Financial Accounting Standards Board ("FASB") issued amended guidance for identifying separate deliverables in a revenue-generating transaction where multiple deliverables exist, and provides guidance for allocating and recognizing revenues based on those separate deliverables. This update also requires additional disclosure related to the significant assumptions used to determine the revenue recognition of the separate deliverables. This guidance is required to be applied prospectively to new or significantly modified revenue arrangements. Edison International adopted this guidance effective January 1, 2011. The adoption of this accounting standards update did not have a material impact on Edison International's consolidated results of operations, financial position or cash flows.

Fair Value Measurements and Disclosures

The FASB issued an accounting standards update modifying the disclosure requirements related to fair value measurements. Under these requirements, purchases and settlements for Level 3 fair value measurements are presented on a gross basis, rather than net. Edison International adopted this guidance effective January 1, 2011.

8


Table of Contents


Accounting Guidance Not Yet Adopted

Fair Value Measurement

In May 2011, the FASB issued an accounting standards update modifying the fair value measurement and disclosure guidance. This guidance prohibits grouping of financial instruments for purposes of fair value measurement and requires the value be based on the individual security. This amendment also results in new disclosures primarily related to Level 3 measurements including quantitative disclosure about unobservable inputs and assumptions, a description of the valuation processes and a narrative description of the sensitivity of the fair value to changes in unobservable inputs. Edison International will adopt this guidance effective January 1, 2012 and does not expect the adoption of this standard will have a material impact on Edison International's consolidated statements of income, financial position or cash flows.

Presentation of Comprehensive Income

In June 2011, the FASB issued an accounting standards update on the presentation of comprehensive income. An entity can elect to present items of net income and other comprehensive income in one continuous statement, referred to as the statement of comprehensive income, or in two separate but consecutive statements. Edison International will adopt this guidance effective January 1, 2012. Edison International currently presents the statement of comprehensive income immediately following the statement of income and expects to continue to do so. The adoption of this accounting standards update does not change the items that constitute net income and other comprehensive income.


Note 2. Consolidated Statements of Changes in Equity

The following table provides the changes in equity for the six months ended June 30, 2011.

 
  Equity Attributable to Edison International   Noncontrolling Interests    
 
(in millions)
  Common
Stock

  Accumulated
Other
Comprehensive
Loss

  Retained
Earnings

  Subtotal
  Other
  Preferred
and
Preference
Stock

  Total
Equity

 
   

Balance at December 31, 2010

  $ 2,331   $ (76 ) $ 8,328   $ 10,583   $ 4   $ 907   $ 11,494  
       

Net income

            376     376         29     405  

Other comprehensive loss

        (21 )       (21 )           (21 )

Common stock dividends declared ($0.64 per share)

            (209 )   (209 )           (209 )

Dividends, distributions to noncontrolling interests and other

                    (2 )   (29 )   (31 )

Stock-based compensation and other

    4         (17 )   (13 )           (13 )

Noncash stock-based compensation and other

    12         (2 )   10         (1 )   9  

Issuance of preference stock

                        123     123  
       

Balance at June 30, 2011

  $ 2,347   $ (97 ) $ 8,476   $ 10,726   $ 2   $ 1,029   $ 11,757  
   

9


Table of Contents

The following table provides the changes in equity for the six months ended June 30, 2010:

 
  Equity Attributable to Edison International   Noncontrolling Interests    
 
(in millions)
  Common
Stock

  Accumulated
Other
Comprehensive
Income

  Retained
Earnings

  Subtotal
  Other
  Preferred
and
Preference
Stock

  Total
Equity

 
   

Balance at December 31, 2009

  $ 2,304   $ 37   $ 7,500   $ 9,841   $ 258   $ 907   $ 11,006  
       

Net income

            580     580         26     606  

Other comprehensive loss

        (49 )       (49 )           (49 )

Deconsolidation of variable interest entities

                    (249 )       (249 )

Cumulative effect of a change in accounting principle, net of tax

            15     15             15  

Common stock dividends declared ($0.63 per share)

            (205 )   (205 )           (205 )

Dividends, distributions to noncontrolling interests and other

                    (3 )   (26 )   (29 )

Stock-based compensation and other

    2         (4 )   (2 )           (2 )

Noncash stock-based compensation and other

    9         (7 )   2             2  
       

Balance at June 30, 2010

  $ 2,315   $ (12 ) $ 7,879   $ 10,182   $ 6   $ 907   $ 11,095  
   


Note 3. Variable Interest Entities

A variable interest entity ("VIE") is defined as a legal entity whose equity owners do not have sufficient equity at risk, or, as a group, the holders of the equity investment at risk lack any of the following three characteristics: decision-making rights, the obligation to absorb losses, or the right to receive the expected residual returns of the entity. The primary beneficiary is identified as the variable interest holder that has both the power to direct the activities of the VIE that most significantly impact the entity's economic performance and the obligation to absorb losses or the right to receive benefits from the entity that could potentially be significant to the VIE. The primary beneficiary is required to consolidate the VIE. Commercial and operating activities are generally the factors that most significantly impact the economic performance of VIEs in which Edison International has a variable interest. Commercial and operating activities include construction, operation and maintenance, fuel procurement, dispatch and compliance with regulatory and contractual requirements.

Categories of Variable Interest Entities

Projects or Entities that are Consolidated

At June 30, 2011 and December 31, 2010, EMG consolidated 13 and 14 projects, respectively, with a total generating capacity of 570 MW and 580 MW, respectively, that have interests held by others. In April 2011, EMG sold its 75% ownership interest in a Minnesota wind project.

10


Table of Contents

The following table presents summarized financial information of the projects that were consolidated by EMG:

(in millions)
  June 30,
2011

  December 31,
2010

 
   

Current assets

  $ 39   $ 26  

Net property, plant and equipment

    712     739  

Other long-term assets

    5     6  
       
 

Total assets

  $ 756   $ 771  
       

Current liabilities

  $ 23   $ 25  

Long-term debt net of current portion

    68     71  

Deferred revenues

    69     71  

Other long-term liabilities

    21     21  
       
 

Total liabilities

  $ 181   $ 188  
       

Noncontrolling interests

 
$

3
 
$

4
 
   

At June 30, 2011 and December 31, 2010, assets serving as collateral for the debt obligations had a carrying value of $163 million and primarily consist of property, plant and equipment.

Variable Interest in VIEs that are not Consolidated

Power Purchase Contracts

SCE has 16 power purchase agreements ("PPAs") that have variable interests in VIEs, including 6 tolling agreements through which SCE provides the natural gas to operate the plants and 10 contracts with qualifying facilities ("QFs") that contain variable pricing provisions based on the price of natural gas. SCE has concluded that it is not the primary beneficiary of these VIEs since it does not control the commercial and operating activities of these entities. In general, because payments for capacity are the primary source of income, the most significant economic activity for SCE's VIEs is the operation and maintenance of the power plants.

As of the balance sheet date, the carrying amount of assets and liabilities in SCE's consolidated balance sheet that relate to its involvement with VIEs result from amounts due under the PPAs or the fair value of those derivative contracts. Under these contracts, SCE recovers the costs incurred under its approved long-term power procurement plans. SCE has no residual interest in the entities and has not provided or guaranteed any debt or equity support, liquidity arrangements, performance guarantees or other commitments associated with these contracts other than the purchase commitments described in Note 9. As a result, there is no significant potential exposure to loss as a result of SCE's involvement with these VIEs. The aggregate capacity dedicated to SCE for these VIE projects was 3,820 MW at June 30, 2011 and the amounts that SCE paid to these projects were $83 million and $117 million for the three months ended June 30, 2011 and 2010, respectively, and $169 million and $242 million for the six months ended June 30, 2011 and 2010, respectively. These amounts are recovered in customer rates.

Equity Interests

EMG accounts for domestic gas and wind energy projects in which it has less than a 100% ownership interest, and cannot exercise unilateral control, under the equity method. At June 30, 2011 and December 31, 2010, EMG had five significant variable interests in natural gas projects that are not consolidated, consisting of the Big 4 projects (Kern River, Midway-Sunset, Sycamore and Watson) and the Sunrise project. A subsidiary of EMG operates three of the four Big 4 projects and the Sunrise project and EMG's partner provides the fuel management services for the Big 4 projects. In addition, the executive director of these projects is provided by EMG's partner. Commercial and operating activities are jointly controlled by a management committee of each VIE. Accordingly, EMG accounts for its variable interests under the equity method.

At June 30, 2011 and December 31, 2010, EMG accounts for its interests in two renewable wind generating facilities, the Elkhorn Ridge and San Juan Mesa projects, under the equity method. In addition, EMG

11


Table of Contents


accounts for its interests in Community Wind North, which achieved commercial operation on May 28, 2011, under the equity method. The commercial and operating activities of these entities are jointly directed by representatives of each partner. Thus, EMG is not the primary beneficiary of these projects.

The following table presents the carrying amount of EMG's investments in unconsolidated VIEs and the maximum exposure to loss for each investment:

 
  June 30, 2011  
(in millions)
  Investment
  Maximum
Exposure

 
   

Natural gas-fired projects

  $ 321   $ 321  

Renewable energy projects

    229     229  
   

EMG's maximum exposure to loss in its VIEs accounted for under the equity method is generally limited to its investment in these entities. One of EMG's domestic energy projects has long-term debt that is secured by a pledge of project entity assets, but does not provide for recourse to EMG. Accordingly, a default under the project financing could result in foreclosure on the assets of the project entity resulting in a loss of some or all of EMG's investment, but would not require EMG to contribute additional capital. At June 30, 2011, entities which EMG has accounted for under the equity method had indebtedness of $65 million, of which $16 million is proportionate to EMG's ownership interest in this project.


Note 4. Fair Value Measurements

Recurring Fair Value Measurements

Fair value is defined as the price that would be received to sell an asset or paid to transfer a liability in an orderly transaction between market participants at the measurement date, referred to as an exit price. Fair value of an asset or liability should consider assumptions that market participants would use in pricing the asset or liability, including assumptions about nonperformance risk.

Edison International categorizes financial assets and liabilities into a fair value hierarchy based on valuation inputs used to derive fair value. The hierarchy gives the highest priority to unadjusted quoted market prices in active markets for identical assets and liabilities (Level 1 measurements) and the lowest priority to unobservable inputs (Level 3 measurements).

12


Table of Contents

The following table sets forth assets and liabilities that were accounted for at fair value by level within the fair value hierarchy:

 
  As of June 30, 2011  
(in millions)
  Level 1
  Level 2
  Level 3
  Netting
and
Collateral1

  Total
 
   

Assets at Fair Value

                               

Money market funds2

  $ 743   $   $   $   $ 743  
       

Derivative contracts:

                               
 

Electricity

        44     231     (33 )   242  
 

Natural gas

        65     11         76  
 

Fuel oil

    6             (6 )    
 

Tolling

            41         41  
 

Coal

        1         (1 )    
       

Subtotal of commodity contracts

    6     110     283     (40 )   359  
       

Long-term disability plan

    9                 9  
       

Nuclear decommissioning trusts:

                               
 

Stocks3

    2,062                 2,062  
 

Municipal bonds

        812             812  
 

U.S. government and agency securities

    309     118             427  
 

Corporate bonds4

        310             310  
 

Short-term investments, primarily cash equivalents5

    4     31             35  
       

Subtotal of nuclear decommissioning trusts

    2,375     1,271             3,646  
       

Total assets6

    3,133     1,381     283     (40 )   4,757  
       

Liabilities at Fair Value

                               

Derivative contracts:

                               
 

Electricity

        9     71     (9 )   71  
 

Natural gas

        239     6     (1 )   244  
 

Tolling

            481         481  
       

Subtotal of commodity contracts

        248     558     (10 )   796  

Interest rate contracts

        22             22  
       

Total liabilities

        270     558     (10 )   818  
       

Net assets (liabilities)

  $ 3,133   $ 1,111   $ (275 ) $ (30 ) $ 3,939  
   

13


Table of Contents


 
  As of December 31, 2010  
(in millions)
  Level 1
  Level 2
  Level 3
  Netting
and
Collateral1

  Total
 
   

Assets at Fair Value

                               

Money market funds2

  $ 1,100   $   $   $   $ 1,100  
       

Derivative contracts:

                               
 

Electricity

        70     363     (61 )   372  
 

Natural gas

    1     69     11     (1 )   80  
 

Fuel oil

    8             (8 )    
 

Tolling

            118         118  
       

Subtotal of commodity contracts

    9     139     492     (70 )   570  
       

Long-term disability plan

    9                 9  
       

Nuclear decommissioning trusts:

                               
 

Stocks3

    2,029                 2,029  
 

Municipal bonds

        790             790  
 

Corporate bonds4

        346             346  
 

U.S. government and agency securities

    215     73             288  
 

Short-term investments, primarily cash equivalents5

    1     31             32  
       

Subtotal of nuclear decommissioning trusts

    2,245     1,240             3,485  
       

Total assets6

    3,363     1,379     492     (70 )   5,164  
       

Liabilities at Fair Value

                               

Derivative contracts:

                               
 

Electricity

        13     40     (21 )   32  
 

Natural gas

        286     11     (4 )   293  
 

Tolling

            344         344  
 

Coal

        1         (1 )    
       

Subtotal of commodity contracts

        300     395     (26 )   669  

Interest rate contracts

        16             16  
       

Total liabilities

        316     395     (26 )   685  
       

Net assets (liabilities)

  $ 3,363   $ 1,063   $ 97   $ (44 ) $ 4,479  
   
1
Represents the netting of assets and liabilities under master netting agreements and cash collateral across the levels of the fair value hierarchy. Netting among positions classified within the same level is included in that level.

2
Money market funds are included in cash and cash equivalents and restricted cash on Edison International's consolidated balance sheets.

3
Approximately 68% and 67% of the equity investments were located in the United States at June 30, 2011 and December 31, 2010, respectively.

4
Corporate bonds are diversified, and included $27 million at both June 30, 2011 and December 31, 2010, respectively, for collateralized mortgage obligations and other asset backed securities.

5
Excludes net receivables of $11 million and net liabilities of $5 million at June 30, 2011 and December 31, 2010, respectively, of interest and dividend receivables and receivables related to pending securities sales and payables related to pending securities purchases.

6
Excludes $31 million at both June 30, 2011 and December 31, 2010, respectively, of cash surrender value of life insurance investments for deferred compensation.

14


Table of Contents

The following table sets forth a summary of changes in the fair value of Level 3 assets and liabilities:

 
  Three months ended
June 30,
  Six months ended
June 30,
 
(in millions)
  2011
  2010
  2011
  2010
 
   

Fair value, net asset (liabilities) at beginning of period

  $ (44 ) $ (397 ) $ 97   $ 62  

Total realized/unrealized gains (losses):

                         
 

Included in earnings1

    18     (18 )   18     27  
 

Included in regulatory assets and liabilities2

    (247 )   (294 )   (382 )   (781 )
 

Included in accumulated other comprehensive income

    (4 )   (2 )   (3 )   4  

Purchases

    22     26     28     32  

Settlements

    (20 )   (24 )   (31 )   (52 )

Transfers in or out of Level 3

        6     (2 )   5  
       

Fair value, net liability at end of period

  $ (275 ) $ (703 ) $ (275 ) $ (703 )
   

Change during the period in unrealized losses related to assets and liabilities held at the end of the period3

  $ (226 ) $ (287 ) $ (368 ) $ (717 )
   
1
Reported in "Competitive power generation" revenue on Edison International's consolidated statements of income.

2
Due to regulatory mechanisms, SCE's realized and unrealized gains and losses are recorded as regulatory assets and liabilities.

3
Amounts reported in "Competitive power generation" revenue on Edison International's consolidated statements of income were $14 million and $(2) million for the three months ended June 30, 2011 and 2010, respectively, and were $8 million and $32 million for the six months ended June 30, 2011 and 2010, respectively. The remainder of the unrealized losses relate to SCE. See 2 above.

Edison International determines the fair value for transfers in and transfers out of each level at the end of each reporting period. There were no significant transfers between levels during 2011 and 2010.

Valuation Techniques Used to Determine Fair Value

Level 1

Includes financial assets and liabilities where fair value is determined using unadjusted quoted prices in active markets that are available at the measurement date for identical assets and liabilities. Financial assets and liabilities classified as Level 1 include exchange-traded equity securities, exchange traded derivatives, U.S. treasury securities and money market funds.

Level 2

Pricing inputs include quoted prices for similar assets and liabilities in active markets and inputs that are observable for the asset or liability, either directly or indirectly, for substantially the full term of the derivative instrument. Financial assets and liabilities utilizing Level 2 inputs include fixed-income securities and over-the-counter derivatives.

Derivative contracts that are over-the-counter traded are valued using pricing models to determine the net present value of estimated future cash flows and are generally classified as Level 2. Inputs to the pricing models include forward published or posted clearing prices from exchanges (New York Mercantile Exchange and Intercontinental Exchange) for similar instruments and discount rates. A primary source that best represents traded activity for each market is used to develop observable forward market prices in determining the fair value of these positions. Broker quotes or prices from exchanges are used to validate and corroborate the primary source. These price quotations reflect mid-market prices (average of bid and ask) and are obtained from sources believed to provide the most liquid market for the commodity. Broker quotes are incorporated when corroborated with other information which may include a combination of prices from exchanges, other brokers and comparison to executed trades.

15


Table of Contents

Level 3

Includes financial assets and liabilities where fair value is determined using techniques that require significant unobservable inputs. Over-the-counter options, bilateral contracts, capacity contracts, QF contracts, derivative contracts that trade infrequently (such as congestion revenue rights ("CRRs") in the California market), long-term power agreements, and derivative contracts with counterparties that have significant nonperformance risks are generally valued using pricing models that incorporate unobservable inputs and are classified as Level 3. Assumptions are made in order to value derivative contracts in which observable inputs are not available. In circumstances where Edison International cannot verify fair value with observable market transactions, it is possible that a different valuation model could produce a materially different estimate of fair value. As markets continue to develop and more pricing information becomes available, Edison International continues to assess valuation methodologies used to determine fair value.

For derivative contracts that trade infrequently (illiquid financial transmission rights and CRRs), changes in fair value are based on models forecasting the value of those contracts. The models' inputs are reviewed and the fair value is adjusted when it is concluded that a change in inputs would result in a new valuation that better reflects the fair value of those derivative contracts. For illiquid long-term power agreements, fair value is based upon the discounting of future electricity and natural gas prices derived from a proprietary model using the risk free discount rate for a similar duration contract, adjusted for credit risk and market liquidity. Changes in fair value are based on changes to forward market prices, including forecasted prices for illiquid forward periods. The fair value of the majority of SCE's derivatives that are classified as Level 3 is determined using uncorroborated non-binding broker quotes and models which may require SCE to extrapolate short-term observable inputs in order to calculate fair value. Broker quotes are obtained from several brokers and compared against each other for reasonableness.

Nonperformance Risk

The fair value of the derivative assets and liabilities are adjusted for nonperformance risk. To assess nonperformance risks, SCE considers the probability of and the estimated loss incurred if a party to the transaction were to default. SCE also considers collateral, netting agreements, guarantees and other forms of credit support when assessing nonperformance. EMG reviews credit ratings of counterparties (and related default rates based on such credit ratings) and prices of credit default swaps. The market price (or premium) for credit default swaps represents the price that a counterparty would pay to transfer the risk of default, typically bankruptcy, to another party. A credit default swap is not directly comparable to the credit risks of derivative contracts, but provides market information of the related risk of nonperformance. The nonperformance risk adjustment represented an insignificant amount at both June 30, 2011 and December 31, 2010.

Nuclear Decommissioning Trusts

SCE's nuclear decommissioning trust investments include equity securities, U.S. treasury securities and other fixed-income securities. Equity and treasury securities are classified as Level 1 as fair value is determined by observable market prices in active or highly liquid and transparent markets. The remaining fixed-income securities are classified as Level 2. The fair value of these financial instruments is based on evaluated prices that reflect significant observable market information such as reported trades, actual trade information of similar securities, benchmark yields, broker/dealer quotes, issuer spreads, bids, offers and relevant credit information.

Fair Value of Long-Term Debt Recorded at Carrying Value

The carrying amounts and fair values of long-term debt are:

 
  June 30, 2011   December 31, 2010  
(in millions)
  Carrying
Amount

  Fair
Value

  Carrying
Amount

  Fair
Value

 
   

Long-term debt, including current portion

  $ 13,009   $ 13,075   $ 12,419   $ 12,360  
   

16


Table of Contents

Fair values of long-term debt are based on evaluated prices that reflect significant observable market information such as reported trades, actual trade information of similar securities, benchmark yields, broker/dealer quotes of new issue prices and relevant credit information.

The carrying value of trade receivables, payables and short-term debt approximates fair value.


Note 5. Debt and Credit Agreements

Long-Term Debt

In May 2011, SCE issued $500 million of 3.875% first and refunding mortgage bonds due in 2021. The proceeds from these bonds were used to repay commercial paper borrowings and to fund SCE's capital program.

In May 2011, SCE purchased $56 million of its tax-exempt bonds that were subject to remarketing and also converted these bonds to a variable rate structure. These bonds are held by SCE and remain outstanding and have not been retired or cancelled.


Project Financings

Walnut Creek

On July 27, 2011, EMG completed, through wholly owned subsidiaries, non-recourse financings to fund construction of the Walnut Creek project, a 479 MW natural gas-fired peaker plant in southern California. The financings included $122 million of letter of credit and working capital facilities, and also included floating rate construction loans totaling $495 million (with initial fundings of $48 million) that will convert to 10-year amortizing term loans by June 30, 2013, subject to meeting specified conditions.

As of July 27, 2011, EME entered into interest rate swap agreements and forward-starting interest rate swap agreements that converted the floating rate London Interbank Offered Rate ("LIBOR") construction loans to fixed rates. Under the interest rate swap agreements, EME will pay fixed rates of an average of 0.81% through May 31, 2013. Under the forward-starting swaps agreements, EME will pay an average fixed rate of 3.59% beginning June 30, 2013 through May 31, 2023. Interest under the project-level construction term loan of $442 million initially accrues at LIBOR plus 2.25% and increases by 0.25% after the third, sixth and ninth anniversaries. Interest on the intermediate holding company construction term loan of $53 million accrues at LIBOR plus 4.00% over the term.


Viento Funding II Wind Financing Amendment

In February 2011, EME completed, through its subsidiary, Viento Funding II, Inc., an amendment of its 2009 non-recourse financing of its interests in the Wildorado, San Juan Mesa and Elkhorn Ridge wind projects. The amendment increased the financing amount to $255 million, which included a $227 million ten-year term loan (expiring in December 2020), a $23 million seven-year letter of credit facility and a $5 million seven-year working capital facility. At June 30, 2011, $216 million was outstanding under this loan. The amount of outstanding letters of credit was $23 million. Interest under the term loan accrues at LIBOR plus 2.75% initially with the rate increasing 0.25% on every fourth anniversary.


Credit Agreements and Short-Term Debt

At June 30, 2011, SCE's outstanding short-term debt was $200 million at a weighted-average interest rate of 0.33%. This short-term debt was supported by a $2.4 billion credit facility. At December 31, 2010, there was no outstanding short-term debt. At June 30, 2011, letters of credit issued under SCE's credit facilities aggregated $71 million and are scheduled to expire in twelve months or less.

At June 30, 2011, Edison International (Parent)'s outstanding short-term debt was $79 million at a weighted-average interest rate of 0.55%. At December 31, 2010, the outstanding short-term debt was $19 million at a weighted-average interest rate of 0.63%.

17


Table of Contents


Letters of Credit

At June 30, 2011, standby letters of credit under EME's credit facility aggregated $116 million and were scheduled to expire as follows: $39 million in 2011 and $77 million in 2012. The aggregate amount includes $39 million of letters of credit issued for the benefit of SCE, which is the power purchase agreement counterparty for the Walnut Creek project. In addition, letters of credit under EME's subsidiaries' credit facilities aggregated $51 million, $3 million of which was under the Midwest Generation, LLC (Midwest Generation) credit facility, and were scheduled to expire as follows: $7 million in 2011, $16 million in 2012, $10 million in 2017, and $18 million in 2018. Certain letters of credit are subject to automatic annual renewal provisions.


Note 6. Derivative Instruments and Hedging Activities

Electric Utility

Commodity Price Risk

SCE is exposed to commodity price risk which represents the potential impact that can be caused by a change in the market value of a particular commodity. SCE's hedging program reduces ratepayer exposure to variability in market prices related to SCE's power and gas activities. As part of this program, SCE enters into options, swaps, forwards, tolling arrangements and CRRs. These transactions are pre-approved by the California Public Utilities Commission ("CPUC") or executed in compliance with CPUC-approved procurement plans. SCE recovers its related hedging costs through the energy resource recovery account ("ERRA") balancing account, and as a result, exposure to commodity price risk is not expected to impact earnings, but may impact cash flows.

SCE's electricity price exposure arises from electricity purchased from and sold to the California and other wholesale markets as a result of differences between SCE's load requirements and the amount of energy delivered from its generating facilities, power purchase agreements and California Department of Water Resources ("CDWR") contracts allocated to SCE.

SCE's natural gas price exposure arises from natural gas purchased for generation at the Mountainview power plant and peaker plants, QF contracts where pricing is based on a monthly natural gas index and power purchase agreements in which SCE has agreed to provide the natural gas needed for generation, referred to as tolling arrangements.

Notional Volumes of Derivative Instruments

The following table summarizes the notional volumes of derivatives used for hedging activities:

 
   
  Economic Hedges  
Commodity
  Unit of Measure
  June 30,
2011

  December 31,
2010

 
   

Electricity options, swaps and forwards

  GWh     34,471     32,138  

Natural gas options, swaps and forwards

  Bcf     255     250  

CRRs

  GWh     147,992     181,291  

Tolling arrangements

  GWh     105,631     114,599  
   

18


Table of Contents

Fair Value of Derivative Instruments

The following table summarizes the gross and net fair values of commodity derivative instruments at June 30, 2011:

 
  Derivative Assets   Derivative Liabilities    
 
(in millions)
  Short-
Term

  Long-
Term

  Subtotal
  Short-
Term

  Long-
Term

  Subtotal
  Net
Liability

 
   

Non-trading activities

                                           

Economic hedges

  $ 89   $ 200   $ 289   $ 243   $ 579   $ 822   $ 533  

Netting and collateral

    (11 )   (21 )   (32 )   (12 )   (21 )   (33 )   (1 )
       

Total

  $ 78   $ 179   $ 257   $ 231   $ 558   $ 789   $ 532  
   

The following table summarizes the gross and net fair values of commodity derivative instruments at December 31, 2010:

 
  Derivative Assets   Derivative Liabilities    
 
(in millions)
  Short-
Term

  Long-
Term

  Subtotal
  Short-
Term

  Long-
Term

  Subtotal
  Net
Liability

 
   

Non-trading activities

                                           

Economic hedges

  $ 87   $ 367   $ 454   $ 216   $ 449   $ 665   $ 211  

Netting and collateral

                (4 )       (4 )   (4 )
       

Total

  $ 87   $ 367   $ 454   $ 212   $ 449   $ 661   $ 207  
   

Income Statement Impact of Derivative Instruments

SCE recognizes realized gains and losses on derivative instruments as purchased-power expense and expects to recover these costs from ratepayers. As a result, realized gains and losses are not reflected in earnings, but may temporarily affect cash flows. Due to expected future recovery from ratepayers, unrealized gains and losses are recorded as regulatory assets and liabilities and therefore are also not reflected in earnings. The results of derivative activities and related regulatory offsets are recorded in cash flows from operating activities in the consolidated statements of cash flows.

The following table summarizes the components of economic hedging activity:

 
  Three months ended
June 30,
  Six months ended
June 30,
 
(in millions)
  2011
  2010
  2011
  2010
 
   

Realized losses

  $ (35 ) $ (38 ) $ (74 ) $ (62 )

Unrealized losses

    (227 )   (276 )   (323 )   (857 )
   

Contingent Features/Credit Related Exposure

Certain derivative instruments and power procurement contracts under SCE's power and natural gas hedging activities contain collateral requirements. SCE has historically provided collateral in the form of cash and/or letters of credit for the benefit of counterparties. These requirements can vary depending upon the level of unsecured credit extended by counterparties, changes in market prices relative to contractual commitments and other factors.

Certain of these power contracts contain a provision that requires SCE to maintain an investment grade credit rating from each of the major credit rating agencies, referred to as a credit-risk-related contingent feature. If SCE's credit rating were to fall below investment grade, SCE may be required to pay the derivative liability or post additional collateral. The aggregate fair value of all derivative liabilities with these credit-risk-related contingent features was $164 million and $67 million as of June 30, 2011 and December 31, 2010, respectively, for which SCE has posted no collateral and $4 million of collateral to its

19


Table of Contents


counterparties for the respective periods. If the credit-risk-related contingent features underlying these agreements were triggered on June 30, 2011, SCE would be required to post $12 million of collateral.

Counterparty Default Risk Exposure

As part of SCE's procurement activities, SCE contracts with a number of utilities, energy companies, financial institutions, and other companies, collectively referred to as counterparties. If a counterparty were to default on its contractual obligations, SCE could be exposed to potentially volatile spot markets for buying replacement power or selling excess power. In addition, SCE would be exposed to the risk of non-payment of accounts receivable, primarily related to sales of excess energy and realized gains on derivative instruments. All of the contracts that SCE has entered into with counterparties are either entered into under SCE's short-term or long-term procurement plan which has been approved by the CPUC, or the contracts are approved by the CPUC before becoming effective. As a result of regulatory recovery mechanisms, losses from non-performance are not expected to affect earnings, but may temporarily affect cash flows.

To manage credit risk, SCE looks at the risk of a potential default by counterparties. Credit risk is measured by the loss that would be incurred if counterparties failed to perform pursuant to the terms of their contractual obligations. To mitigate credit risk from counterparties, master netting agreements are used whenever possible and counterparties may be required to pledge collateral when deemed necessary.

Competitive Power Generation

EMG uses derivative instruments to reduce its exposure to market risks that arise from price fluctuations of electricity, capacity, fuel, emission allowances, and transmission rights. Additionally, EMG's financial results can be affected by fluctuations in interest rates. The derivative financial instruments vary in duration, ranging from a few days to several years, depending upon the instrument. To the extent that EMG does not use derivative instruments to hedge these market risks, the unhedged portions will be subject to the risks and benefits of spot market price movements.

Risk management positions may be designated as cash flow hedges or economic hedges, which are derivatives that are not designated as cash flow hedges. Economic hedges are accounted for at fair value on EMG's consolidated balance sheets with offsetting changes recorded on the consolidated statements of operations. For derivative instruments that qualify for hedge accounting treatment, the fair value is recognized, to the extent effective, on EMG's consolidated balance sheets with offsetting changes in fair value recognized in accumulated other comprehensive loss until the related forecasted transaction occurs. The results of derivative activities are recorded in cash flows from operating activities on the consolidated statements of cash flows.

Derivative instruments that are utilized for trading purposes are measured at fair value and included on the consolidated balance sheets as derivative assets or liabilities. Changes in fair value are recognized in operating revenues on the consolidated statements of operations.

Where EMG's derivative instruments are subject to a master netting agreement and the criteria of authoritative guidance are met, EMG presents its derivative assets and liabilities on a net basis on its consolidated balance sheets.

20


Table of Contents

Notional Volumes of Derivative Instruments

The following table summarizes the notional volumes of derivatives used for hedging and trading activities:

June 30, 2011  
 
   
   
   
  Hedging Activities    
 
Commodity
  Instrument
  Classification
  Unit of Measure
  Cash Flow
Hedges

  Economic
Hedges

  Trading
Activities

 
   
Electricity   Forwards/Futures   Sales   GWh     18,901 1   17,660 3   39,629  
Electricity   Forwards/Futures   Purchases   GWh     203 1   17,750 3   42,863  
Electricity   Capacity   Sales   MW-Day
(in thousands)
    171 2       17 2
Electricity   Capacity   Purchases   MW-Day
(in thousands)
    17 2       247 2
Electricity   Congestion   Sales   GWh         124 4   14,314 4
Electricity   Congestion   Purchases   GWh         5,459 4   287,221 4
Natural gas   Forwards/Futures   Sales   bcf         1.5     354.1  
Natural gas   Forwards/Futures   Purchases   bcf         1.5     351.8  
Fuel oil   Forwards/Futures   Sales   barrels             45,000  
Fuel oil   Forwards/Futures   Purchases   barrels         240,000     70,000  
Coal   Forwards/Futures   Sales   tons             2,564,250  
Coal   Forwards/Futures   Purchases   tons             2,564,250  
   

 

(in millions)
Instrument
  Purpose
  Type of Hedge
  Notional Amount
  Expiration Date
 
Amortizing interest rate swap   Convert floating rate (6-month LIBOR) debt to fixed rate (3.175%) debt   Cash flow   $ 84   June 2016

Amortizing interest rate swap

 

Convert floating rate (6-month LIBOR) debt to fixed rate (3.415%) debt

 

Cash flow

 

 

110

 

December 2020

Amortizing interest rate swap

 

Convert floating rate (3-month LIBOR) debt to fixed rate (4.29%) debt

 

Cash flow

 

 

120

 

December 2025

Amortizing interest rate swap

 

Convert floating rate (3-month LIBOR) debt to fixed rate (3.46%) debt

 

Cash flow

 

 

67

 

March 2026
 

21


Table of Contents


December 31, 2010  
 
   
   
   
  Hedging Activities    
 
Commodity
  Instrument
  Classification
  Unit of Measure
  Cash Flow
Hedges

  Economic
Hedges

  Trading
Activities

 
   
Electricity   Forwards/Futures   Sales   GWh     16,799 1   22,456 3   34,630  
Electricity   Forwards/Futures   Purchases   GWh     408 1   22,931 3   37,669  
Electricity   Capacity   Sales   MW-Day
(in thousands)
    190 2       136 2
Electricity   Capacity   Purchases   MW-Day
(in thousands)
    8 2       419 2
Electricity   Congestion   Sales   GWh         136 4   12,020 4
Electricity   Congestion   Purchases   GWh         1,143 4   187,689 4
Natural gas   Forwards/Futures   Sales   bcf             30.6  
Natural gas   Forwards/Futures   Purchases   bcf             34.3  
Fuel oil   Forwards/Futures   Sales   barrels         250,000     10,000  
Fuel oil   Forwards/Futures   Purchases   barrels         490,000     10,000  
Coal   Forwards/Futures   Sales   tons             2,630,500  
Coal   Forwards/Futures   Purchases   tons             2,645,500  
   

 

(in millions)
Instrument
  Purpose
  Type of Hedge
  Notional
Amount

  Expiration Date
 
Amortizing interest rate swap   Convert floating rate (6-month LIBOR) debt to fixed rate (3.175%) debt   Cash flow   $ 138   June 2016

Amortizing forward starting interest rate swap

 

Convert floating rate (3-month LIBOR) debt to fixed rate (4.29%) debt

 

Cash flow

 

 

122

 

December 2025

Amortizing forward starting interest rate swap

 

Convert floating rate (3-month LIBOR) debt to fixed rate (3.46%) debt

 

Cash flow

 

 

68

 

March 2026
 
1
EMG's hedge products include forward and futures contracts that qualify for hedge accounting. This category excludes power contracts for the coal plants which meet the normal purchases and sales exception and are accounted for on the accrual method.

2
EMG's hedge transactions for capacity result from bilateral trades. Capacity sold in the PJM Reliability Pricing Model (RPM) auction is not accounted for as a derivative.

3
EMG also entered into transactions that adjust financial and physical positions, or day-ahead and real-time positions to reduce costs or increase gross margin. These positions largely offset each other. The net sales positions of these categories are primarily related to hedge transactions that are not designated as cash flow hedges.

4
Congestion contracts include financial transmission rights, transmission congestion contracts or congestion revenue rights. These positions are similar to a swap, where the buyer is entitled to receive a stream of revenues (or charges) based on the hourly day-ahead price differences between two locations.

22


Table of Contents

Fair Value of Derivative Instruments

The following table summarizes the fair value of derivative instruments reflected on EMG's consolidated balance sheets:

June 30, 2011  
 
  Derivative Assets   Derivative Liabilities    
 
 
  Net Assets
(Liabilities)

 
(in millions)
  Short-term
  Long-term
  Subtotal
  Short-term
  Long-term
  Subtotal
 
   

Non-trading activities

                                           
 

Cash flow hedges

  $ 27   $ 2   $ 29   $ 14   $ 34   $ 48   $ (19 )
 

Economic hedges

    60     4     64     51     1     52     12  

Trading activities

    141     88     229     98     20     118     111  
       

    228     94     322     163     55     218     104  

Netting and collateral received1

    (189 )   (31 )   (220 )   (157 )   (32 )   (189 )   (31 )
       

Total

  $ 39   $ 63   $ 102   $ 6   $ 23   $ 29   $ 73  
   

December 31, 2010
   
   
   
   
   
   
   
 
   

Non-trading activities

                                           
 

Cash flow hedges

  $ 54   $ 2   $ 56   $ 10   $ 25   $ 35   $ 21  
 

Economic hedges

    77     2     79     71         71     8  

Trading activities

    184     103     287     148     29     177     110  
       

    315     107     422     229     54     283     139  

Netting and collateral received1

    (269 )   (37 )   (306 )   (223 )   (35 )   (258 )   (48 )
       

Total

  $ 46   $ 70   $ 116   $ 6   $ 19   $ 25   $ 91  
   
1
Netting of derivative receivables and derivative payables and the related cash collateral received and paid is permitted when a legally enforceable master netting agreement exists with a derivative counterparty.

Income Statement Impact of Derivative Instruments

The following table provides the cash flow hedge activity as part of accumulated other comprehensive loss:

 
  Cash Flow Hedge Activity1
Six Months Ended
June 30,
   
 
  Income Statement
Location

(in millions)
  2011
  2010
 

Beginning of period derivative gains

  $ 27   $ 175    

Effective portion of changes in fair value

    (13 )   30    

Reclassification to net income

    (29 )   (122 ) Competitive power generation revenue
         

End of period derivative gains (losses)

  $ (15 ) $ 83    
 
1
Unrealized derivative gains (losses) are before income taxes. The after-tax amounts recorded in accumulated other comprehensive income (loss) at June 30, 2011 and 2010 were $(9) million and $50 million, respectively.

For additional information, see Note 11—Accumulated Other Comprehensive Loss.

The portion of a cash flow hedge that does not offset the change in the value of the transaction being hedged, which is commonly referred to as the ineffective portion, is immediately recognized in earnings. EMG recorded net gains (losses) of none and $(7) million during the second quarters of 2011 and 2010, respectively, and $2 million and $1 million during the six months ended June 30, 2011 and 2010, respectively, in operating revenues on the consolidated statements of operations representing the amount of cash flow hedge ineffectiveness.

23


Table of Contents

The effect of realized and unrealized gains (losses) from derivative instruments used for economic hedging and trading purposes on the consolidated statements of operations is presented below:

 
   
  Three Months Ended
June 30,
  Six Months Ended
June 30,
 
(in millions)
  Income Statement Location
  2011
  2010
  2011
  2010
 
   

Economic hedges

  Competitive power generation revenue   $ 20   $ (3 ) $ 26   $ (7 )

  Fuel     (2 )   (2 )   4     (1 )

Trading activities

 

Competitive power generation revenue

   
41
   
33
   
57
   
80
 
   

Contingent Features

Certain derivative instruments contain margin and collateral deposit requirements. Since EMG's subsidiaries' credit ratings are below investment grade, EMG's subsidiaries have provided collateral in the form of cash and letters of credit for the benefit of derivative counterparties. The aggregate fair value of all derivative instruments with credit-risk-related contingent features was in an asset position at June 30, 2011 and, accordingly, the contingent features described below do not currently have liquidity exposure. Some hedge contracts include provisions related to a change in control or material adverse effect resulting from amendments or modifications to the related credit facility. Failure by EMG or Midwest Generation to comply with these provisions may result in a termination event under the hedge contracts, enabling the counterparties to terminate and liquidate all outstanding transactions and demand immediate payment of amounts owed to them. Edison Mission Marketing & Trading, Inc. ("EMMT") has hedge contracts that do not require margin, but provide that each party can request additional credit support in the form of adequate assurance of performance in the case of an adverse development affecting the other party. Future increases in power prices could expose EMG's subsidiaries to termination payments or additional collateral postings.

Margin and Collateral Deposits

Margin and collateral deposits include cash deposited with counterparties and brokers, and cash received from counterparties and brokers as credit support under energy contracts. The amount of margin and collateral deposits generally varies based on changes in the fair value of the related positions. Edison International nets counterparty receivables and payables where balances exist under master netting agreements. Edison International presents the portion of its margin and collateral deposits netted with its derivative positions on its consolidated balance sheets. The following table summarizes margin and collateral deposits provided to and received from counterparties:

(in millions)
  June 30,
2011

  December 31,
2010

 
   

Collateral provided to counterparties:

             
 

Offset against derivative liabilities

  $ 4   $ 8  
 

Reflected in margin and collateral deposits

    64     65  

Collateral received from counterparties:

             
 

Offset against derivative assets

    33     52  
   

24


Table of Contents


Note 7. Income Taxes

Effective Tax Rate

The table below provides a reconciliation of income tax expense computed at the federal statutory income tax rate to the income tax provision from continuing operations.

 
  Three months ended
June 30,
  Six months ended
June 30,
 
(in millions)
  2011
  2010
  2011
  2010
 
   

Income from continuing operations before income taxes

  $ 254   $ 220   $ 535   $ 612  
       

Provision for income tax at federal statutory rate of 35%

    89     77     187     214  

Increase (decrease) in income tax from:

                         
 

Items presented with related state income tax, net:

                         
   

Global Settlement related1

        (138 )       (138 )
   

Change in tax accounting method for asset removal costs2

        (40 )       (40 )
 

State tax – net of federal benefit

    4     16     13     23  
 

Health care legislation3

                39  
 

Production and housing credits

    (19 )   (19 )   (36 )   (34 )
 

Property-related and other

    (12 )   (32 )   (37 )   (50 )
       

Total income tax expense from continuing operations

  $ 62   $ (136 ) $ 127   $ 14  
       

Effective tax rate

    24%     (62% )   24%     2%  
   
1
During the second quarter of 2010, Edison International recognized a $138 million earnings benefit resulting from the acceptance by the California Franchise Tax Board of the tax positions finalized with the Internal Revenue Service ("IRS") in 2009 as part of the Global Settlement.

2
During the second quarter of 2010, the IRS approved Edison International's request to change its tax accounting method for asset removal costs primarily related to SCE's infrastructure replacement program. As a result, Edison International recognized a $40 million earnings benefit (of which $28 million relates to asset removal costs incurred prior to 2010) from deducting asset removal costs earlier in the construction cycle. These deductions were recorded on a flow-through basis.

3
During the first quarter of 2010, Edison International recorded a $39 million non-cash charge to reverse previously recognized federal tax benefits eliminated by the federal health care legislation enacted in March 2010. The health care law eliminated the federal tax deduction for retiree health care costs to the extent those costs are eligible for federal Medicare Part D subsidies.

The decreased benefit provided by property-related and other items was primarily due to lower deductions for internally developed software in 2011 compared to the respective periods in 2010.

The CPUC requires flow-through ratemaking treatment for the current tax benefit arising from certain property-related and other temporary differences which reverse over time. The accounting treatment for these temporary differences results in recording regulatory assets and liabilities for amounts that would otherwise be recorded to deferred income tax expense.


Accounting for Uncertainty in Income Taxes

Authoritative guidance related to accounting for uncertainty in income taxes requires an enterprise to recognize, in its financial statements, the best estimate of the impact of a tax position by determining if the weight of the available evidence indicates it is more likely than not, based solely on the technical merits, that the position will be sustained upon examination. The guidance requires the disclosure of all unrecognized tax benefits, which includes both the reserves recorded for tax positions on filed tax returns and the unrecognized portion of affirmative claims.

25


Table of Contents


Unrecognized Tax Benefits

The following table provides a reconciliation of unrecognized tax benefits:

(in millions)
  2011
  2010
 
   

Balance at January 1,

  $ 565   $ 664  

Tax positions taken during the current year:

             
 

Increases

    26     35  

Tax positions taken during a prior year:

             
 

Increases

    14     127  
 

Decreases

    (10 )   (40 )
 

Decreases for settlements during the period

        (82 )
       

Balance at June 30,

  $ 595   $ 704  
   

As of June 30, 2011 and December 31, 2010, $468 million and $455 million, respectively, of the unrecognized tax benefits, if recognized, would impact the effective tax rate.

Edison International's federal income tax returns and its California combined franchise tax returns are currently open for years subsequent to 2002. In addition, specific California refund claims made by Edison International for years 1991 through 2002 are currently under review by the Franchise Tax Board. The IRS examination phase of tax years 2003 through 2006 was completed in the fourth quarter of 2010, which included proposed adjustments for the following two items:

A proposed adjustment increasing the taxable gain on the 2004 sale of EMG's international assets, which if sustained, would result in a federal tax payment of approximately $189 million, including interest and penalties through June 30, 2011 (the IRS has asserted a 40% penalty for understatement of tax liability related to this matter).

A proposed adjustment to disallow a component of SCE's repair allowance deduction, which if sustained, would result in a federal tax payment of approximately $91 million, including interest through June 30, 2011.

Edison International disagrees with the proposed adjustments and filed a protest with the IRS in the first quarter of 2011.


Accrued Interest and Penalties

The total amount of accrued interest and penalties related to Edison International's income tax liabilities was $222 million and $213 million as of June 30, 2011 and December 31, 2010, respectively.

The net after-tax interest and penalties recognized in income tax expense was $2 million and $5 million for the three- and six-month periods ended June 30, 2011, respectively, compared to a benefit of $101 million and $88 million for the same periods in 2010.


Note 8. Compensation and Benefit Plans

Pension Plans and Postretirement Benefits Other Than Pensions

Pension Plans

During the six months ended June 30, 2011, Edison International made contributions of $61 million and during the remainder of 2011, expects to make $69 million of additional contributions. Annual contributions made to most of SCE's pension plans are recovered through CPUC-approved regulatory mechanisms and are expected to be, at a minimum, equal to the annual expense.

26


Table of Contents

Expense components are:

 
  Three months ended
June 30,
  Six months ended
June 30,
 
(in millions)
  2011
  2010
  2011
  2010
 
   

Service cost

  $ 43   $ 34   $ 86   $ 68  

Interest cost

    52     54     104     108  

Expected return on plan assets

    (60 )   (52 )   (120 )   (104 )

Amortization of prior service cost

    2     2     4     4  

Amortization of net loss

    6     7     12     14  
       

Expense under accounting standards

    43     45     86     90  

Regulatory adjustment – deferred

    (6 )   (14 )   (12 )   (28 )
       

Total expense recognized

  $ 37   $ 31   $ 74   $ 62  
   


Postretirement Benefits Other Than Pensions

During the six months ended June 30, 2011, Edison International made contributions of $12 million and during the remainder of 2011, expects to make $44 million of additional contributions. Annual contributions made to SCE's plans are recovered through CPUC-approved regulatory mechanisms and are expected to be, at a minimum, equal to the annual expense.

Expense components are:

 
  Three months ended
June 30,
  Six months ended
June 30,
 
(in millions)
  2011
  2010
  2011
  2010
 
   

Service cost

  $ 11   $ 8   $ 22   $ 16  

Interest cost

    33     31     66     62  

Expected return on plan assets

    (28 )   (25 )   (56 )   (50 )

Amortization of prior service cost (credit)

    (9 )   (9 )   (18 )   (18 )

Amortization of net loss

    9     8     18     16  
       

Total expense

  $ 16   $ 13   $ 32   $ 26  
   


Stock-Based Compensation

During the six months ended June 30, 2011, Edison International granted its 2011 stock-based compensation awards, which included stock options, performance shares and restricted stock units.


Stock Options

The following is a summary of the status of Edison International stock options:

 
   
  Weighted-Average    
 
 
  Stock options
  Exercise
Price

  Remaining
Contractual
Term (Years)

  Aggregate
Intrinsic Value
(in millions)

 
   

Outstanding at December 31, 2010

    19,142,209   $ 33.28              

Granted

    3,314,149     37.95              

Expired

    (87,641 )   47.93              

Forfeited

    (244,066 )   32.52              

Exercised

    (1,002,771 )   24.74              
                   

Outstanding at June 30, 2011

    21,121,880     34.37     6.26        
             

Vested and expected to vest at June 30, 2011

    20,639,870     34.38     6.21   $ 136  
       

Exercisable at June 30, 2011

    12,613,025     34.70     4.74     93  
   

27


Table of Contents

At June 30, 2011, there was $28 million of total unrecognized compensation cost related to stock options, net of expected forfeitures. That cost is expected to be recognized over a weighted-average period of approximately three years.


Performance Shares

The following is a summary of the status of Edison International nonvested performance shares:

 
  Equity Awards   Liability Awards  
 
  Shares
  Weighted-Average
Grant Date
Fair Value

  Shares
  Weighted-Average
Fair Value

 
   

Nonvested at December 31, 2010

    415,028   $ 30.99     415,028   $ 34.74  

Granted

    148,697     27.96     148,697        

Forfeited

    (113,762 )   43.42     (113,762 )      
                       

Nonvested at June 30, 2011

    449,963     28.04     449,963     29.43  
   

The current portion of nonvested performance shares classified as liability awards is reflected in "Other current liabilities" and the long-term portion is reflected in "Pensions and benefits" on the consolidated balance sheets.

At June 30, 2011, there was $6 million of total unrecognized compensation cost related to performance shares. That cost is expected to be recognized over a weighted-average period of approximately two years.


Restricted Stock Units

The following is a summary of the status of Edison International nonvested restricted stock units:

 
  Restricted
Stock Units

  Weighted-Average
Grant Date
Fair Value

 
   

Nonvested at December 31, 2010

    644,796   $ 32.18  

Granted

    247,408     37.95  

Forfeited

    (16,467 )   32.13  

Paid Out

    (104,420 )   52.35  
       

Nonvested at June 30, 2011

    771,317   $ 31.98  
   

At June 30, 2011, there was $12 million of total unrecognized compensation cost related to restricted stock units, net of expected forfeitures, which is expected to be recognized as follows: $4 million in 2011, $5 million in 2012 and $3 million in 2013.

28


Table of Contents


Supplemental Data on Stock Based Compensation

 
  Three months ended
June 30,
  Six months ended
June 30,
 
(in millions)
  2011
  2010
  2011
  2010
 
   

Stock based compensation expense1

  $ 11   $ 9   $ 17   $ 17  

Income tax benefits related to stock compensation expense

    5     4     7     7  

Excess tax benefits2

    2     1     4     2  

Stock options

                         
 

Cash used to purchase shares to settle options

    20     6     39     13  
 

Cash from participants to exercise stock options

    12     4     25     9  
 

Value of options exercised

    8     2     14     4  

Restricted stock units

                         
 

Value of shares settled

            5      
 

Tax benefits realized from settlement of awards

            2      
   
1
Reflected in "Operations and maintenance" on the consolidated statements of income.

2
Reflected in "Settlements of stock based compensation—net" in the financing section of the consolidated statements of cash flows.

No performance shares were settled for both the six month periods ended June 30, 2011 and 2010.


Note 9. Commitments and Contingencies

Third-Party Power Purchase Agreements

At June 30, 2011, additional renewable energy power purchase contracts became effective and were classified as operating leases. SCE's additional commitments under these contracts are estimated to be: $6 million in 2011, $116 million each year in 2012 – 2015 and $1.9 billion for the period remaining thereafter.


Other Commitments

Fuel Supply Contracts

At June 30, 2011, Midwest Generation and EME Homer City Generation L.P. ("Homer City") had commitments to purchase coal from third-party suppliers at fixed prices, subject to adjustment clauses. These commitments are estimated to aggregate $634 million, summarized as follows: $277 million for the remainder of 2011, $304 million in 2012 and $53 million in 2013. In July 2011, Midwest Generation entered into additional contractual agreements for the purchase of coal. These commitments are estimated to be $6 million for the remainder of 2011, $28 million for 2012, $145 million for 2013 and $150 million for 2014.


Turbine Commitments

At June 30, 2011, EMG had commitments to purchase wind turbines of $45 million due in 2011 and $8 million due in 2012. Based on a June 2011 contract amendment, EMG's failure to schedule turbine delivery by September 2011 would result in a termination obligation equal to its turbine deposit, which would result in a $29 million charge against earnings. EMG has identified a project in which to place these turbines. However, there is no assurance that development will be completed and the turbines will be used for this project.

On October 8, 2010, an agreement was reached to settle disputes included in the complaint filed by EMG against Mitsubishi Power Systems Americas, Inc. and Mitsubishi Heavy Industries, Ltd. with respect to a wind turbine generator supply agreement. As a result of this agreement, EMG may elect to deploy up to 60 additional wind turbines (aggregating 144 MW) that were part of the original contract, or may be obligated to make a payment of up to $30 million following the end of the three-year period if it has not elected to deploy the additional turbines and if certain other criteria apply.

29


Table of Contents


Capital Expenditures

At June 30, 2011, EMG's subsidiaries had firm commitments to spend approximately $242 million during the remainder of 2011, $205 million in 2012 and $19 million in 2013 on capital and construction expenditures. These expenditures primarily relate to the Walnut Creek project, selective non-catalytic reduction (SNCR) equipment at the Midwest Generation plants, and the construction of wind projects. EMG intends to fund these expenditures through project level financing, U.S. Treasury grants, Midwest Generation and EME lines of credit, if available, cash on hand and cash generated from operations.


Guarantees and Indemnities

Edison International's subsidiaries have various financial and performance guarantees and indemnity agreements which are issued in the normal course of business. The contracts discussed below included performance guarantees.


Environmental Indemnities Related to the Midwest Generation Plants

In connection with the acquisition of the Midwest Generation plants, EME agreed to indemnify Commonwealth Edison Company ("Commonwealth Edison") with respect to specified environmental liabilities before and after December 15, 1999, the date of sale. The indemnification obligations are reduced by any insurance proceeds and tax benefits related to such indemnified claims and are subject to a requirement that Commonwealth Edison takes all reasonable steps to mitigate losses related to any such indemnification claim. Also, in connection with the sale-leaseback transaction related to the Powerton and Joliet Stations in Illinois, EME agreed to indemnify the lessors for specified environmental liabilities. These indemnities are not limited in term or amount. Due to the nature of the obligations under these indemnities, a maximum potential liability cannot be determined. Commonwealth Edison has advised EME that Commonwealth Edison believes it is entitled to indemnification for all liabilities, costs, and expenses that it may be required to bear as a result of the litigation discussed below under "—Contingencies—Midwest Generation New Source Review and Other Litigation." Except as discussed below, EME has not recorded a liability related to these environmental indemnities.

Midwest Generation entered into a supplemental agreement with Commonwealth Edison and Exelon Generation Company LLC on February 20, 2003 to resolve a dispute regarding interpretation of Midwest Generation's reimbursement obligation for asbestos claims under the environmental indemnities set forth in the Asset Sale Agreement. Under this supplemental agreement, Midwest Generation agreed to reimburse Commonwealth Edison and Exelon Generation for 50% of specific asbestos claims pending as of February 2003 and related expenses less recovery of insurance costs, and agreed to a sharing arrangement for liabilities and expenses associated with future asbestos-related claims as specified in the agreement. The obligations under this agreement are not subject to a maximum liability. The supplemental agreement had an initial five-year term with an automatic renewal provision for subsequent one-year terms (subject to the right of either party to terminate); pursuant to the automatic renewal provision, it has been extended until February 2012. There were approximately 222 cases for which Midwest Generation was potentially liable that had not been settled and dismissed at June 30, 2011. Midwest Generation had recorded a liability of $55 million at June 30, 2011 related to this contractual indemnity.

The amounts recorded by Midwest Generation for the asbestos-related liability are based upon a number of assumptions. Future events, such as the number of new claims to be filed each year, the average cost of disposing of claims, as well as the numerous uncertainties surrounding asbestos litigation in the United States, could cause the actual costs to be higher or lower than projected.


Environmental Indemnity Related to the Homer City Plant

In connection with the acquisition of the Homer City plant, Homer City agreed to indemnify the sellers with respect to specified environmental liabilities before and after the date of sale. EME guaranteed this obligation of Homer City. Also, in connection with the sale-leaseback transaction related to the Homer City plant, Homer City agreed to indemnify the lessors for specified environmental liabilities. Due to the nature of the obligations under these indemnity provisions, they are not subject to a maximum potential liability and do not have expiration dates. EME has not recorded a liability related to this indemnity. For discussion of the New Source Review lawsuit filed against Homer City, see "—Contingencies—Homer City New Source Review and Other Litigation."

30


Table of Contents


Indemnities Provided under Asset Sale and Sale-Leaseback Agreements

The asset sale agreements for the sale of EME's international assets contain indemnities from EME to the purchasers, including indemnification for taxes imposed with respect to operations of the assets prior to the sale and for pre-closing environmental liabilities. Not all indemnities under the asset sale agreements have specific expiration dates. At June 30, 2011, EME had recorded a liability of $45 million related to these matters.

In connection with the sale of various domestic assets, EME has from time to time provided indemnities to the purchasers for taxes imposed with respect to operations of the assets prior to the sale. EME has also provided indemnities to purchasers for items specified in each agreement (for example, specific pre-existing litigation matters and/or environmental conditions). Not all indemnities under the asset sale agreements have specific expiration dates. Due to the nature of these potential obligations, a maximum potential liability cannot be determined and has not been recorded as a liability related to these indemnities.

In connection with the sale-leaseback transactions related to the Homer City plant in Pennsylvania, the Powerton and Joliet Stations in Illinois and, previously, the Collins Station in Illinois, EME and several of its subsidiaries entered into tax indemnity agreements. Although the Collins Station lease terminated in April 2004, Midwest Generation's tax indemnity agreement with the former lease equity investor is still in effect. Under these tax indemnity agreements, these entities agreed to indemnify the lessors in the sale-leaseback transactions for specified adverse tax consequences that could result in certain situations set forth in each tax indemnity agreement, including specified defaults under the respective leases. The potential indemnity obligations under these tax indemnity agreements could be significant. Due to the nature of these potential obligations, EME cannot determine a maximum potential liability which would be triggered by a valid claim from the lessors. EME has not recorded a liability for these matters.


Indemnity Provided as Part of the Acquisition of Mountainview

In connection with the acquisition of the Mountainview power plant, SCE agreed to indemnify the seller with respect to specific environmental claims related to SCE's previously owned San Bernardino Generating Station, divested by SCE in 1998 and reacquired as part of the Mountainview acquisition. SCE retained certain responsibilities with respect to environmental claims as part of the original divestiture of the station. The aggregate liability for either party to the purchase agreement for damages and other amounts is a maximum of $60 million. This indemnification for environmental liabilities expires on or before March 12, 2033. SCE has not recorded a liability related to this indemnity.


Mountainview Filter Cake Indemnity

The Mountainview power plant utilizes water from on-site groundwater wells and City of Redlands ("City") recycled water for cooling purposes. Unrelated to the operation of the plant, the groundwater contains perchlorate. The pumping of the water removes perchlorate from the aquifer beneath the plant and concentrates it in the plant's wastewater treatment "filter cake." Use of this impacted groundwater for cooling purposes was mandated by Mountainview's California Energy Commission permit. SCE has indemnified the City for cleanup or associated actions related to groundwater contaminated by perchlorate due to the disposal of filter cake at the City's solid waste landfill. The obligations under this agreement are not limited to a specific time period or subject to a maximum liability. SCE has not recorded a liability related to this indemnity.


Other Edison International Indemnities

Edison International provides other indemnifications through contracts entered into in the normal course of business. These are primarily indemnifications against adverse litigation outcomes in connection with underwriting agreements, and indemnities for specified environmental liabilities and income taxes with respect to assets sold. Edison International's obligations under these agreements may or may not be limited in terms of time and/or amount, and in some instances Edison International may have recourse against third parties. Edison International has not recorded a liability related to these indemnities. The overall maximum amount of the obligations under these indemnifications cannot be reasonably estimated.

31


Table of Contents


Contingencies

In addition to the matters disclosed in these Notes, Edison International is involved in other legal, tax and regulatory proceedings before various courts and governmental agencies regarding matters arising in the ordinary course of business. Edison International believes the outcome of these other proceedings will not materially affect its results of operations or liquidity.


Midwest Generation New Source Review and Other Litigation

In August 2009, the United States Environmental Protection Agency ("US EPA") and the State of Illinois filed a complaint in the Northern District of Illinois alleging that Midwest Generation or Commonwealth Edison performed repair or replacement projects at six Illinois coal-fired electric generating stations in violation of the Prevention of Significant Deterioration ("PSD") requirements and of the New Source Performance Standards of the Clean Air Act ("CAA"), including alleged requirements to obtain a construction permit and to install controls sufficient to meet best available control technology ("BACT") emission rates. The US EPA also alleged that Midwest Generation and Commonwealth Edison violated certain operating permit requirements under Title V of the CAA. Finally, the US EPA alleged violations of certain opacity and particulate matter standards at the Midwest Generation plants. In addition to seeking penalties ranging from $25,000 to $37,500 per violation, per day, the complaint calls for an injunction ordering Midwest Generation to install controls sufficient to meet BACT emission rates at all units subject to the complaint; to obtain new PSD or New Source Review permits for those units; to amend its applications under Title V of the CAA; to conduct audits of its operations to determine whether any additional modifications have occurred; and to offset and mitigate the harm to public health and the environment caused by the alleged CAA violations. The remedies sought by the plaintiffs in the lawsuit could go well beyond the requirements of the Combined Pollutant Standard ("CPS"). Several Chicago-based environmental action groups have intervened in the case.

Nine of ten PSD claims have been dismissed, along with claims related to alleged violations of Title V of the CAA to the extent based on the dismissed PSD claims. The court has also dismissed all claims asserted against Commonwealth Edison and EME. The court denied a motion to dismiss a claim by the Chicago-based environmental action groups for civil penalties in the remaining PSD claim, but noted that the plaintiffs will be required to convince the court that the statute of limitations should be equitably tolled. The court did not address other counts in the complaint that allege violations of opacity and particulate matter limitations under the Illinois State Implementation Plan and Title V of the CAA. Trial of the liability portion of the case is scheduled to commence June 3, 2013.

In May 2011, two complaints were filed against Midwest Generation in the Northern District of Illinois by residents living near the Crawford and Fisk facilities on behalf of themselves and all others similarly situated, each asserting claims of nuisance, negligence, trespass, and strict liability. The plaintiffs seek to have their suits certified as a class action and request injunctive relief, as well as compensatory and punitive damages.

Adverse decisions in these cases could involve penalties and remedial actions that could have a material impact on the financial condition and results of operations of Midwest Generation and EME. EME cannot predict the outcome of these matters or estimate the impact on the Midwest Generation plants, or its and Midwest Generation's results of operations, financial position or cash flows.


Homer City New Source Review and Other Litigation

In January 2011, the US EPA filed a complaint in the Western District of Pennsylvania against Homer City, the sale-leaseback owner participants of the Homer City plant, and two prior owners of the Homer City plant. The complaint alleges violations of the PSD and Title V provisions of the CAA, as a result of projects in the 1990s performed by prior owners without PSD permits and the subsequent failure to incorporate emissions limitations that meet BACT into the station's Title V operating permit. In addition to seeking penalties ranging from $32,500 to $37,500 per violation, per day, the complaint calls for an injunction ordering Homer City to install controls sufficient to meet BACT emission rates at all units subject to the complaint; to obtain new PSD or New Source Review permits for those units; to amend its applications under Title V of the CAA; to conduct audits of its operations to determine whether any additional modifications have occurred; and to offset and mitigate the harm to public health and the

32


Table of Contents


environment caused by the alleged CAA violations. The Pennsylvania Department of Environmental Protection, the State of New York and the State of New Jersey have intervened in the lawsuit.

Also in January 2011, two residents filed a complaint in the Western District of Pennsylvania, on behalf of themselves and all others similarly situated, against Homer City, the sale-leaseback owner participants of the Homer City plant, two prior owners of the Homer City plant, EME, and Edison International, claiming that emissions from the Homer City plant had adversely affected their health and property values. The plaintiffs seek to have their suit certified as a class action and request injunctive relief, the funding of a health assessment study and medical monitoring, as well as compensatory and punitive damages.

In April 2011, Homer City filed motions to dismiss both complaints. Adverse decisions in these cases could involve penalties, remedial actions and damages that could have a material impact on the financial condition and results of operations of Homer City and EME. EME cannot predict the outcome of these matters or estimate the impact on the Homer City plant, or its and Homer City's results of operations, financial position or cash flows.


Navajo Nation Litigation

On August 1, 2011, SCE and the other defendants entered into a comprehensive settlement with the Navajo Nation of the litigation filed in June 1999 against SCE and others concerning royalty payments to the Navajo for the coal supplied to the Mohave Generating Station. As amended in April 2010, the Navajo Nation's complaint asserted claims for, among other things, interference with fiduciary duties and contractual relations, fraudulent misrepresentations by nondisclosure, and various contract-related claims. The settlement will result in a payment to the Navajo Nation and other related parties. As a result of the settlement, the Navajo Nation lawsuit will be dismissed. The settlement agreement reached with the Navajo Nation will not impact SCE's results of operations.


Environmental Remediation

Edison International records its environmental remediation liabilities when site assessments and/or remedial actions are probable and a range of reasonably likely cleanup costs can be estimated. Edison International reviews its sites and measures the liability quarterly, by assessing a range of reasonably likely costs for each identified site using currently available information, including existing technology, presently enacted laws and regulations, experience gained at similar sites, and the probable level of involvement and financial condition of other potentially responsible parties. These estimates include costs for site investigations, remediation, operations and maintenance, monitoring and site closure. Unless there is a single probable amount, Edison International records the lower end of this reasonably likely range of costs (reflected in "Other long-term liabilities") at undiscounted amounts as timing of cash flows is uncertain.

As of June 30, 2011, Edison International's recorded estimated minimum liability to remediate its 26 identified material sites (sites in which the upper end of the range of costs is at least $1 million) at SCE (24 sites) and EMG (2 sites primarily related to Midwest Generation) was $60 million, of which $54 million was related to SCE, including $18 million related to San Onofre. In addition to its identified material sites, SCE also has 33 immaterial sites for which the total minimum recorded liability was $3 million. The ultimate costs to clean up Edison International's identified sites may vary from its recorded liability due to numerous uncertainties inherent in the estimation process, such as: the extent and nature of contamination; the scarcity of reliable data for identified sites; the varying costs of alternative cleanup methods; developments resulting from investigatory studies; the possibility of identifying additional sites; and the time periods over which site remediation is expected to occur. Edison International believes that, due to these uncertainties, it is reasonably possible that cleanup costs at these identified material sites and immaterial sites could exceed its recorded liability by up to $192 million and $7 million, respectively, all of which is related to SCE. The upper limit of this range of costs was estimated using assumptions least favorable to Edison International among a range of reasonably possible outcomes.

The CPUC allows SCE to recover 90% of its environmental remediation costs at certain sites, representing $32 million of its recorded liability, through an incentive mechanism (SCE may request to include additional sites). In addition, SCE expects to recover 100% of environmental remediation costs incurred at the majority of the remaining sites through customer rates, representing $21 million of its recorded liability. SCE has recorded a regulatory asset of $53 million at June 30, 2011 for its estimated minimum environmental cleanup costs expected to be recovered through customer rates.

33


Table of Contents

Edison International's identified sites include several sites for which there is a lack of currently available information, including the nature and magnitude of contamination, and the extent, if any, that Edison International may be held responsible for contributing to any costs incurred for remediating these sites. Thus, no reasonable estimate of cleanup costs can be made for these sites.

SCE expects to clean up its identified sites over a period of up to 30 years. Remediation costs in each of the next several years are expected to range from $5 million to $17 million. Costs incurred for the six months ended June 30, 2011 and 2010, were $7 million and $3 million, respectively.

Based upon the CPUC's regulatory treatment of environmental remediation costs incurred at SCE, Edison International believes that costs ultimately recorded will not materially affect its results of operations, financial position or cash flows. There can be no assurance, however, that future developments, including additional information about existing sites or the identification of new sites, will not require material revisions to estimates.


Nuclear Insurance

Federal law limits public liability claims from a nuclear incident to the amount of available financial protection, which is currently approximately $12.6 billion. SCE and other owners of San Onofre and Palo Verde have purchased the maximum private primary insurance available ($375 million). The balance is covered by a loss sharing program among nuclear reactor licensees. If a nuclear incident at any licensed reactor in the United States results in claims and/or costs which exceed the primary insurance at that plant site, all nuclear reactor licensees could be required to contribute their share of the liability in the form of a deferred premium.

Based on its ownership interests, SCE could be required to pay a maximum of approximately $235 million per nuclear incident. However, it would have to pay no more than approximately $35 million per incident in any one year. If the public liability limit above is insufficient, federal law contemplates that additional funds may be appropriated by Congress. This could include an additional assessment on all licensed reactor operators as a measure for raising further federal revenue.

Property damage insurance covers losses up to $500 million, including decontamination costs, at San Onofre and Palo Verde. Decontamination liability and property damage coverage exceeding the primary $500 million also has been purchased in amounts greater than federal requirements. Additional insurance covers part of replacement power expenses during an accident-related nuclear unit outage. A mutual insurance company owned by entities with nuclear facilities issues these policies. If losses at any nuclear facility covered by the arrangement were to exceed the accumulated funds for these insurance programs, SCE could be assessed retrospective premium adjustments of up to approximately $48 million per year. Insurance premiums are charged to operating expense.


Spent Nuclear Fuel

Under federal law, the Department of Energy ("DOE") is responsible for the selection and construction of a facility for the permanent disposal of spent nuclear fuel and high-level radioactive waste. The DOE did not meet its contractual obligation to begin acceptance of spent nuclear fuel by January 31, 1998. Extended delays by the DOE have led to the construction of costly alternatives and associated siting and environmental issues. Currently, both San Onofre and Palo Verde have interim storage for spent nuclear fuel on site sufficient for the current license period.

In June 2010, the United States Court of Federal Claims issued a decision granting SCE and its co-owners damages of approximately $142 million to recover costs incurred through December 31, 2005 for the DOE's failure to meet its obligation to begin accepting spent nuclear fuel from San Onofre. The decision has been appealed by the DOE. Additional legal action would be necessary to recover damages incurred after that date. Any damages recovered would be returned to SCE ratepayers or used to offset past or future fuel decommissioning or storage costs for the benefit of ratepayers.

34


Table of Contents


Note 10. Regulatory and Environmental Developments

Environmental Developments

Cross-State Air Pollution Rule

On July 6, 2011, the US EPA adopted its final Cross-State Air Pollution Rule ("CSAPR") which will replace the Clean Air Interstate Rule ("CAIR") beginning on January 1, 2012. CSAPR is the final form of a previously proposed replacement for the CAIR, called the Clean Air Transport Rule that was released in 2010. CSAPR establishes emissions reductions for annual sulfur dioxide ("SO2") emissions and annual ozone season nitrogen oxide ("NOx") emissions in two phases: a first phase effective January 1, 2012 and, in most states subject to the program (including Illinois and Pennsylvania), a second phase effective January 1, 2014 that requires additional reductions in annual SO2 emissions.

CSAPR, like the CAIR, is an allowance-based regulation that provides for emissions trading. Under CSAPR, the amount of actual SO2 or NOx emissions from operations will need to be matched by a sufficient amount of SO2 or NOx allowances that are either allocated or purchased in the open market. In connection with CSAPR, the US EPA has, for each phase, established SO2 and NOx allowance allocations for each state and each generating unit subject to the regulation, and at the close of the annual compliance period, units must surrender allowances for each ton of SO2 and NOx emitted or face penalties. While trading of allowances is permitted within designated groups of states, the rule provides for enhanced penalties against a unit that surrenders allowances in excess of certain predefined limits for itself and for the state in which it is located.

The installation of SO2 controls will require capital commitments for the Midwest Generation plants well in advance of the 2014 effective date, some of which will be expended in 2011, in order to meet regulatory deadlines. EMG believes that Midwest Generation's current environmental remediation plan, including allocated allowances and capital expenditures, required to meet the CPS will also comply with the requirements of CSAPR. However, the SO2 allowances allocated to Homer City in CSAPR Phase I (25,797 tons in 2012 and 2013) are significantly lower than the amount that would be required based on Homer City's historical emissions (2010 SO2 emissions were 112,951 tons). Therefore, pending installation of additional equipment for Units 1 and 2 (Homer City's Unit 3 is equipped with a wet scrubber flue gas desulfurization system to meet environmental standards), Homer City expects that it will be required to procure additional allowances. It is unclear at this time whether SO2 allowances in sufficient quantity and at prices that Homer City can pass through in power prices will be available in 2012 and 2013. Also, Homer City's SO2 shortfall is expected to exceed limits on the number of allowances it will be permitted to surrender, and, therefore, may subject Homer City to penalties in certain cases. Accordingly, Homer City is evaluating alternative options, including reduced dispatch and fuel switching, for complying with Phase I of CSAPR. Failure by Homer City to develop and implement a Phase I compliance plan based on allowances could result in its modifying operations at one or more units or significantly curtailing power output. The cost of allowances, together with possible operational impacts or reductions of output, which may be required to comply with Phase I of CSAPR, could have a material effect on Homer City.

Homer City has begun work on designing SO2 and particulate emissions control equipment for Units 1 and 2. While the Phase II SO2 emission allowances under CSAPR (11,068 tons) are less than were contemplated under the proposed Clean Air Transport Rule, the additional reductions are not expected to materially change the design for the SO2 controls at Units 1 and 2. The installation of those SO2 controls will require capital commitments for the Homer City plant well in advance of the 2014 effective date, some of which will be expended in 2011, in order to meet regulatory deadlines. Given the relatively short period of time before Phase II of CSAPR takes effect in 2014, there is no assurance that Homer City will be able to complete all the work that will be required before the deadline. Homer City is continuing to review technologies available to reduce SO2 and mercury emissions; however, it has not determined the most effective and efficient technology to meet all requirements that may be imposed on it. Consequently, the timing, selection of technology and ultimate capital costs remain uncertain. Based on preliminary estimates, Homer City currently believes the cost of such equipment may be between $600 million and $700 million.

Homer City does not currently have sufficient capital and does not expect to generate sufficient capital from operations to fund such retrofits and will have to seek financing, which will be subject to decisions by Homer City's lessors, holders of the pass-through certificates and new providers of capital funding. There is

35


Table of Contents


no assurance that sufficient financing will be obtained or will not result in significant dilution of Homer City's interest in the Homer City plant.

Proposed Hazardous Air Pollutant Regulations

In March 2011, the US EPA issued proposed National Emission Standards for Hazardous Air Pollutants, limiting emissions of hazardous air pollutants from coal- and oil-fired electrical generating units. This regulation is expected to be finalized by November 2011. Based on its continuing review, EMG does not expect that these standards, if adopted as proposed, would require Midwest Generation to make material changes to the approach to compliance with state and federal environmental regulations that it contemplates for CPS compliance. EMG also does not expect that these standards, if adopted as proposed, would require Homer City to make additional capital requirements beyond those that would be required to comply with CSAPR.

Water Quality

Once-Through Cooling Issues

In March 2011, the US EPA issued proposed standards under the federal Clean Water Act which would affect cooling water intake structures at generating facilities. The standards are intended to protect aquatic organisms by reducing capture in screens attached to cooling water intake structures (impingement) and in the water volume brought into the facilities (entrainment). The regulations are expected to be finalized by July 2012. Edison International is evaluating the proposed standards and believes, from a preliminary review, that compliance with the proposed standards regarding impingement will be achievable for both the Midwest Generation plants and the Homer City plant without incurring material additional capital expenditures or operating costs. The required measures to comply with the proposed standards regarding entrainment are subject to the discretion of the permitting authority, and Edison International is unable at this time to assess potential costs of compliance, which could be significant for the Midwest Generation plants and San Onofre, but are not expected to be material for the Homer City plant, which already has cooling towers.

In addition to the proposed draft US EPA standards, the existing California once-through cooling policy may result in significant capital expenditures at San Onofre and may affect its operations. If other coastal power plants in California that rely on once-through cooling are forced to shut down or limit operations, the California policy may also significantly impact SCE's ability to procure generating capacity from those plants, which could have an adverse effect on system reliability and the cost of electricity.

Greenhouse Gas Regulation

California Air Resources Board's ("CARB") regulations implementing a California cap-and-trade program continue to be the subject of litigation. In June 2011, the CARB announced that initial cap-and-trade program compliance for the electricity sector would be delayed until January 2013.

In April 2011, California enacted a law requiring that California utilities to procure 33% of their electricity requirements from renewable resources, as defined in the statute. The law requires implementation by the CPUC. The impact of the new 33% law will depend on how the CPUC implements the law, which remains uncertain.

Greenhouse Gas Litigation Developments

In June 2011, the U.S. Supreme Court dismissed public nuisance claims against five power companies, ruling that the CAA and the US EPA actions it authorizes displace federal common law nuisance claims that might arise from the emission of greenhouse gases. The court also affirmed the Second Circuit's determination that at least some of the plaintiffs had standing to bring the case. The court did not address whether the CAA also preempts state law claims arising from the same circumstances.

Parties to the Kivalina case, the appeal of which was deferred before the Ninth Circuit Court of Appeals pending the Supreme Court's ruling described above, have requested that the appeal recommence and have asked for permission to file additional briefs on the impact of the Supreme Court's ruling. The Kivalina case was brought by the Alaskan Native Village of Kivalina seeking damages of up to $400 million for the

36


Table of Contents


cost of relocating the village because the plaintiffs claim that the Arctic ice that has protected the village is melting as a result of climate change. The federal district court dismissed the case against Edison International and the other defendants in October 2009. Due to the nature of these potential obligations, Edison International is unable to estimate the potential liability, if any.

On May 27, 2011, private citizens filed a purported class action complaint in the United States District Court for the Southern District of Mississippi, naming among a large number of defendants, Edison International and its subsidiaries, including SCE and EME. Plaintiffs allege that the defendants' activities resulted in emissions of substantial quantities of greenhouse gases that have contributed to climate change and sea level rise, which in turn are alleged to have increased the destructive force of Hurricane Katrina. The lawsuit alleges causes of action for negligence, public and private nuisance, and trespass, and seeks unspecified compensatory and punitive damages. The claims in this lawsuit are nearly identical to a subset of the claims that were raised against many of the same defendants in a previous lawsuit that was filed in, and dismissed by, the same federal district court where the current case has been filed.


Note 11. Accumulated Other Comprehensive Loss

Edison International's accumulated other comprehensive loss consists of:

(in millions)
  Unrealized
Gain (Loss)
on Cash
Flow Hedges

  Pension and
PBOP – Net
Gain
(Loss)

  Pension and
PBOP – Prior
Service Cost

  Accumulated
Other
Comprehensive
Loss

 
   

Balance at December 31, 2010

  $ 16   $ (87 ) $ (5 ) $ (76 )

Current period change

    (25 )   4         (21 )
       

Balance at June 30, 2011

  $ (9 ) $ (83 ) $ (5 ) $ (97 )
   

Included in accumulated other comprehensive loss at June 30, 2011 was $4 million, net of tax, of unrealized gains on commodity-based cash flow hedges; and $13 million, net of tax, of unrealized losses related to interest rate hedges. The maximum period over which a commodity cash flow hedge is designated is May 31, 2014.

Unrealized gains on commodity hedges consist of futures and forward electricity contracts that qualify for hedge accounting. These gains arise because current forecasts of future electricity prices in these markets are lower than the contract prices. Approximately $8 million of unrealized gains on cash flow hedges, net of tax, are expected to be reclassified into earnings during the next 12 months. Management expects that reclassification of net unrealized gains will increase energy revenues recognized at market prices. Actual amounts ultimately reclassified into earnings over the next 12 months could vary materially from this estimated amount as a result of changes in market conditions.

37


Table of Contents


Note 12. Supplemental Cash Flows Information

Edison International's supplemental cash flows information is:

 
  Six months ended
June 30,
 
(in millions)
  2011
  2010
 
   

Cash payments (receipts) for interest and taxes:

             
 

Interest – net of amounts capitalized

  $ 321   $ 305  
 

Tax payments (refunds) – net

    (44 )   179  
   

Noncash investing and financing activities:

             
 

Accrued capital expenditures

  $ 388   $ 333  
 

Purchase of equipment with note payable

  $ 56   $  
 

Details of debt exchange:

             
   

Pollution-control bonds redeemed

  $ (56 ) $ (203 )
   

Pollution-control bonds issued

    56     203  
 

Consolidation of variable interest entities:

             
   

Assets other than cash

  $   $ (94 )
   

Liabilities and non-controlling interests

        99  
 

Deconsolidation of variable interest entities:

             
   

Assets other than cash

  $   $ 380  
   

Liabilities and noncontrolling interests

        (476 )
 

Dividends declared but not paid:

             
   

Common stock

  $ 104   $ 103  
   

Preferred and preference stock

    15     13  
   


Note 13. Preferred and Preference Stock of Utility

In March 2011, SCE issued 1,250,000 shares of 6.5% Series D preference stock (cumulative, $100 liquidation value). The Series D preference stock may not be redeemed prior to March 1, 2016. After March 1, 2016, SCE may, at its option, redeem the shares, in whole or in part for a price of $100 per share plus accrued and unpaid dividends, if any. These shares are not subject to mandatory redemption. The proceeds from the sale of these shares were used for general corporate purposes.

38


Table of Contents


Note 14. Regulatory Assets and Liabilities

Regulatory assets included on the consolidated balance sheets are:

(in millions)
  June 30,
2011

  December 31,
2010

 
   

Current:

             
 

Regulatory balancing accounts

  $ 268   $ 213  
 

Energy derivatives

    194     162  
 

Other

    7     3  
       

    469     378  
       

Long-term:

             
 

Deferred income taxes – net

    1,912     1,855  
 

Pensions and other postretirement benefits

    1,089     1,097  
 

Unamortized generation investment – net

    328     355  
 

Unamortized loss on reacquired debt

    258     268  
 

Energy derivatives

    465     177  
 

Nuclear-related ARO investment – net

    163     154  
 

Unamortized distribution investment – net

    125     105  
 

Regulatory balancing accounts

    53     56  
 

Other

    297     280  
       

    4,690     4,347  
       

Total Regulatory Assets

  $ 5,159   $ 4,725  
   

Regulatory liabilities included on the consolidated balance sheets are:

(in millions)
  June 30,
2011

  December 31,
2010

 
   

Current:

             

Regulatory balancing accounts

  $ 818   $ 733  

Other

    2     5  
       

    820     738  
       

Long-term:

             

Costs of removal

    2,663     2,623  

ARO

    1,250     1,099  

Regulatory balancing accounts

    846     802  
       

    4,759     4,524  
       

Total Regulatory Liabilities

  $ 5,579   $ 5,262  
   


Note 15. Other Investments

Nuclear Decommissioning Trusts

Future decommissioning costs of removal of nuclear assets are expected to be funded from independent decommissioning trusts, which currently receive contributions of approximately $23 million per year included in SCE customer rates. Contributions to the decommissioning trusts are reviewed every three years by the CPUC. If additional funds are needed for decommissioning, it is probable that the additional funds will be recoverable through customer rates. Funds collected, together with accumulated earnings, will be utilized solely for decommissioning. The CPUC has set certain restrictions related to the investments of these trusts.

39


Table of Contents

The following table sets forth amortized cost and fair value of the trust investments:

 
   
  Amortized Cost
  Fair Value
 
 
   
         
(in millions)
  Longest
Maturity Dates

  June 30,
2011

  December 31,
2010

  June 30,
2011

  December 31,
2010

 
   

Stocks

    $ 862   $ 895   $ 2,062   $ 2,029  

Municipal bonds

  2050     699     706     812     790  

U.S. government and agency securities

  2041     396     270     427     288  

Corporate bonds

  2054     255     288     310     346  

Short-term investments and receivables/payables

  One-year     44     26     46     27  
           

Total

      $ 2,256   $ 2,185   $ 3,657   $ 3,480  
   

Trust fund earnings (based on specific identification) increase the trust fund balance and the ARO regulatory liability. Proceeds from sales of securities (which are reinvested) were $524 million and $315 million for the three months ended June 30, 2011 and 2010, respectively, and $1.1 billion and $600 million for the six months ended June 30, 2011 and 2010, respectively. Unrealized holding gains, net of losses, were $1.4 billion and $1.3 billion at June 30, 2011 and December 31, 2010, respectively.

The following table sets forth a summary of changes in the fair value of the trust:

 
  Three months ended
June 30,
  Six months ended
June 30,
 
(in millions)
  2011
  2010
  2011
  2010
 
   

Balance at beginning of period

  $ 3,619   $ 3,248   $ 3,480   $ 3,140  

Realized gains – net

    12     13     35     34  

Unrealized gains (losses) – net

    4     (205 )   106     (143 )

Other-than-temporary impairments

    (4 )   (7 )   (13 )   (11 )

Interest, dividends, contributions and other

    26     34     49     63  
       

Balance at end of period

  $ 3,657   $ 3,083   $ 3,657   $ 3,083  
   

Due to regulatory mechanisms, earnings and realized gains and losses (including other-than-temporary impairments) have no impact on operating revenue or earnings.


Note 16. Other Income and Expenses

Other income and expenses are as follows:

 
  Three months ended
June 30,
  Six months ended
June 30,
 
(in millions)
  2011
  2010
  2011
  2010
 
   

Other income:

                         
 

Equity AFUDC

  $ 27   $ 25   $ 56   $ 54  
 

Increase in cash surrender value of life insurance policies

    7     6     13     12  
 

Other

    5     4     8     4  
       

Total utility other income

    39     35     77     70  

Competitive power generation and other income

    3     1     6      
       

Total other income

  $ 42   $ 36   $ 83   $ 70  
       

Other expenses:

                         
 

Civic, political and related activities and donations

  $ 9   $ 9   $ 15   $ 15  
 

Other

    4     6     10     11  
       

Total utility other expenses

    13     15     25     26  

Competitive power generation and other expenses

        1         2  
       

Total other expenses

  $ 13   $ 16   $ 25   $ 28  
   

40


Table of Contents


Note 17. Business Segments

Edison International has two business segments for financial reporting purposes: an electric utility operation segment (SCE) and a competitive power generation segment (EMG). The significant accounting policies of the segments are the same as those described in Note 1.

Reportable Segments Information

The following is information (including the elimination of intercompany transactions) related to Edison International's reportable segments:

 
  Three months ended
June 30,
  Six months ended
June 30,
 
(in millions)
  2011
  2010
  2011
  2010
 
   

Operating Revenue:

                         

Electric utility

  $ 2,446   $ 2,247   $ 4,678   $ 4,406  

Competitive power generation

    538     495     1,090     1,147  

Parent and other2

    (1 )   (1 )   (2 )   (1 )
       

Consolidated Edison International

  $ 2,983   $ 2,741   $ 5,766   $ 5,552  
       

Net Income (Loss) attributable to Edison International:

                         

Electric utility

  $ 211   $ 301   $ 433   $ 465  

Competitive power generation1

    (31 )   27     (51 )   104  

Parent and other2

    (4 )   16     (6 )   11  
       

Consolidated Edison International

  $ 176   $ 344   $ 376   $ 580  
   

Segment balance sheet information was:

(in millions)
  June 30,
2011

  December 31,
2010

 
   

Total Assets:

             
 

Electric utility

  $ 37,365   $ 35,906  
 

Competitive power generation

    9,804     9,597  
 

Parent and other2

    (94 )   27  
       

Consolidated Edison International

  $ 47,075   $ 45,530  
   
1
Includes earnings (losses) from discontinued operations of $(1) million and $1 million for the three months ended June 30, 2011 and 2010, respectively, and $(3) million and $8 million for the six months ended June 30, 2011 and 2010, respectively.

2
Includes amounts from Edison International (parent) and other Edison International subsidiaries that are not significant as a reportable segment, as well as intercompany eliminations.

41


Table of Contents


ITEM 2. MANAGEMENT'S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS

FORWARD-LOOKING STATEMENTS

This quarterly report on Form 10-Q contains "forward-looking statements" within the meaning of the Private Securities Litigation Reform Act of 1995. Forward-looking statements reflect Edison International's current expectations and projections about future events based on Edison International's knowledge of present facts and circumstances and assumptions about future events and include any statement that does not directly relate to a historical or current fact. Other information distributed by Edison International that is incorporated in this report, or that refers to or incorporates this report, may also contain forward-looking statements. In this report and elsewhere, the words "expects," "believes," "anticipates," "estimates," "projects," "intends," "plans," "probable," "may," "will," "could," "would," "should," and variations of such words and similar expressions, or discussions of strategy or of plans, are intended to identify forward-looking statements. Such statements necessarily involve risks and uncertainties that could cause actual results to differ materially from those anticipated. Some of the risks, uncertainties and other important factors that could cause results to differ from those currently expected, or that otherwise could impact Edison International, include, but are not limited to:

cost of capital and the ability of Edison International or its subsidiaries to borrow funds and access the capital markets on reasonable terms;

environmental laws and regulations, at both state and federal levels, or changes in the application of those laws, that could require additional expenditures or otherwise affect the cost and manner of doing business, including compliance with CPS at Midwest Generation and the CSAPR and the proposed National Emission Standards for Hazardous Air Pollutants at Midwest Generation and Homer City;

ability of SCE to recover its costs in a timely manner from its customers through regulated rates;

decisions and other actions by the CPUC, the FERC and other regulatory authorities and delays in regulatory actions;

possible customer bypass or departure due to technological advancements or cumulative rate impacts that make self-generation or use of alternative energy sources economically viable;

risks associated with the operation of transmission and distribution assets and nuclear and other power generating facilities including: nuclear fuel storage issues, public safety issues, failure, availability, efficiency, output, cost of repairs and retrofits of equipment and availability and cost of spare parts;

cost and availability of electricity, including the ability to procure sufficient resources to meet expected customer needs in the event of significant counterparty defaults under power purchase agreements;

changes in the fair value of investments and other assets;

changes in interest rates and rates of inflation, including those rates which may be adjusted by public utility regulators;

governmental, statutory, regulatory or administrative changes or initiatives affecting the electricity industry, including the market structure rules applicable to each market and price mitigation strategies adopted by Independent System Operators and Regional Transmission Organizations;

availability and creditworthiness of counterparties and the resulting effects on liquidity in the power and fuel markets and/or the ability of counterparties to pay amounts owed in excess of collateral provided in support of their obligations;

cost and availability of labor, equipment and materials;

ability to obtain sufficient insurance, including insurance relating to SCE's nuclear facilities and wildfire-related liability, and to recover the costs of such insurance;

42


Table of Contents

ability to recover uninsured losses in connection with wildfire-related liability;

effects of legal proceedings, changes in or interpretations of tax laws, rates or policies, and changes in accounting standards;

potential for penalties or disallowances caused by non-compliance with applicable laws and regulations;

cost and availability of coal, natural gas, fuel oil, and nuclear fuel, and related transportation to the extent not recovered through regulated rate cost escalation provisions or balancing accounts;

cost and availability of emission credits or allowances for emission credits;

transmission congestion in and to each market area and the resulting differences in prices between delivery points;

ability to provide sufficient collateral in support of hedging activities and power and fuel purchased;

risks inherent in the development of generation projects and transmission and distribution infrastructure replacement and expansion projects, including those related to project site identification, construction, permitting, and governmental approvals;

risks that competing transmission systems will be built by merchant transmission providers in SCE's territory; and

weather conditions and natural disasters.

Additional information about risks and uncertainties, including more detail about the factors described above, is contained throughout this MD&A and in Edison International's 2010 Form 10-K, including the "Risk Factors" section in Part I, Item 1A. Readers are urged to read this entire report, including the information incorporated by reference, as well as the 2010 Form 10-K, and carefully consider the risks, uncertainties and other factors that affect Edison International's business. Forward-looking statements speak only as of the date they are made and Edison International is not obligated to publicly update or revise forward-looking statements. Readers should review future reports filed by Edison International with the U.S. Securities and Exchange Commission.

This MD&A for the three- and six-month periods ended June 30, 2011 discusses material changes in the consolidated financial condition, results of operations and other developments of Edison International since December 31, 2010, and as compared to the three- and six-month periods ended June 30, 2010. This discussion presumes that the reader has read or has access to Edison International's MD&A for the calendar year 2010 (the "year-ended 2010 MD&A"), which was included in the 2010 Form 10-K.

43


Table of Contents


EDISON INTERNATIONAL MANAGEMENT OVERVIEW

Highlights of Operating Results

 
  Three months ended
June 30,

   
  Six months ended
June 30,

   
 
 
         
(in millions)
  2011
  2010
  Change
  2011
  2010
  Change
 
   

Net Income (Loss) attributable to Edison International

                                     
 

SCE

  $ 211   $ 301   $ (90 ) $ 433   $ 465   $ (32 )
 

EMG

    (31 )   27     (58 )   (51 )   104     (155 )
 

Edison International Parent and Other

    (4 )   16     (20 )   (6 )   11     (17 )
       
 

Edison International Consolidated

    176     344     (168 )   376     580     (204 )
       

Non-Core Items

                                     
 

Global Settlement:

                                     
   

SCE

        53     (53 )       53     (53 )
   

EMG

        58     (58 )       58     (58 )
   

Edison International Parent and Other

        27     (27 )       27     (27 )
 

SCE – tax impact of health care legislation

                    (39 )   39  
 

EMG discontinued operations

    (1 )   1     (2 )   (3 )   8     (11 )
       
 

Total non-core items

    (1 )   139     (140 )   (3 )   107     (110 )
       

Core Earnings (Losses)

                                     
 

SCE

    211     248     (37 )   433     451     (18 )
 

EMG

    (30 )   (32 )   2     (48 )   38     (86 )