BHP BILLITON PRODUCTION SUMMARY

Date

24 October 2002

Number

54/02

BHP BILLITON PRODUCTION REPORT FOR THE QUARTER ENDED 30 SEPTEMBER 2002

BHP Billiton today released its production report for the quarter ended 30 September 2002

Oil and condensate production was six per cent lower than the June 2002 quarter which reflects the scheduled shutdowns at Liverpool Bay, and the Bruce and Keith fields, adverse weather conditions in the Gulf of Mexico reducing production from Typhoon and natural field decline at Griffin (Australia), partially offset by increased production from start up of Laminaria (Australia) phase 2 in June 2002.

****

Further news and information can be found on our Internet site: www.bhpbilliton.com

Australia
Andrew Nairn, Investor Relations
Tel: + 61 3 9609 3952 Mobile: +61 408 313 259
email: Andrew.W.Nairn@bhpbilliton.com

United Kingdom
Mark Lidiard, Investor & Media Relations
Tel: +44 20 7747 3956
email: Mark.Lidiard@bhpbilliton.com

Mandy Frostick, Media Relations
Tel: +61 3 9609 4157 Mobile: +61 419 546 245
email: Mandy.J.Frostick@bhpbilliton.com

South Africa
Michael Campbell, Investor & Media Relations
Tel: +27 11 376 3360 Mobile: +27 82 458 2587
email: Michael.J.Campbell@bhpbilliton.com

United States
Francis McAllister, Investor Relations
Tel: +1 713 961 8625 Mobile: +1 713 480 3699
email: Francis.R.McAllister@bhpbilliton.com

 

 

 

 

 

BHP BILLITON PRODUCTION SUMMARY

QUARTER ENDED

QUARTER ENDED

% CHANGE

SEPT Q02

SEPT Q02

SEPT

JUNE

SEPT

SEPT

SEPT

vs

vs

2001

2002

2002

2002

2001

SEPT Q01

JUNE Q02

PETROLEUM

Crude oil & condensate

('000 bbl)

19,505

19,732

18,550

18,550

19,505

-5%

-6%

Natural gas

(bcf)

71.05

70.66

71.86

71.86

71.05

1%

2%

LPG

('000 tonnes)

182.92

180.43

208.96

208.96

182.92

14%

16%

Ethane

('000 tonnes)

24.05

25.62

27.67

27.67

24.05

15%

8%

ALUMINIUM

Alumina

('000 tonnes)

964

1,018

1,031

1,031

964

7%

1%

Aluminium

('000 tonnes)

244

263

268

268

244

10%

2%

BASE METALS

Copper

('000 tonnes)

202.4

213.5

184.0

184.0

202.4

-9%

-14%

Lead

(tonnes)

54,032

64,768

63,243

63,243

54,032

17%

-2%

Zinc

(tonnes)

29,630

38,942

48,542

48,542

29,630

64%

25%

Gold

(ounces)

71,229

75,589

55,153

55,153

71,229

-23%

-27%

Silver

('000 ounces)

8,741

11,884

11,319

11,319

8,741

29%

-5%

Molybdenum

(tonnes)

152

232

220

220

152

45%

-5%

CARBON STEEL MATERIALS

Iron ore

('000 tonnes)

17,080

17,080

18,468

18,468

17,080

8%

8%

Metallurgical coal

('000 tonnes)

9,035

9,359

8,650

8,650

9,035

-4%

-8%

Manganese ores

('000 tonnes)

972

784

1,095

1,095

972

13%

40%

Manganese alloys

('000 tonnes)

119

169

175

175

119

47%

4%

Hot briquetted iron

('000 tonnes)

386

-

333

333

386

-14%

-

DIAMONDS AND SPECIALTY PRODUCTS

Diamonds

('000 carats)

767

1,023

954

954

767

24%

-7%

ENERGY COAL

Energy coal

('000 tonnes)

22,405

20,571

19,434

19,434

22,405

-13%

-6%

STAINLESS STEEL MATERIALS

Nickel

('000 tonnes)

15.9

17.7

19.1

19.1

15.9

20%

8%

Chrome ores

('000 tonnes)

629

664

713

713

629

13%

7%

Ferrochrome

('000 tonnes)

207

223

238

238

207

15%

7%

BHP BILLITON ATTRIBUTABLE PRODUCTION

QUARTER ENDED

QUARTER ENDED

BHP Billiton

SEPT

DEC

MARCH

JUNE

SEPT

SEPT

SEPT

Interest

2001

2001

2002

2002

2002

2002

2001

PETROLEUM

Production

Crude oil & condensate

(000 bbl)

19,505

19,638

19,644

19,732

18,550

18,550

19,505

Natural gas

(bcf)

71.05

75.47

66.30

70.66

71.86

71.86

71.05

LPG

('000 tonnes)

182.92

173.01

161.20

180.43

208.96

208.96

182.92

Ethane

('000 tonnes)

24.05

18.59

18.87

25.62

27.67

27.67

24.05

ALUMINIUM

ALUMINA

Production ('000 tonnes)

Worsley

86%

662

671

677

686

698

698

662

Suriname

45%

219

209

208

215

221

221

219

Alumar

36%

83

85

111

117

112

112

83

Total

964

965

996

1,018

1,031

1,031

964

ALUMINIUM

Production ('000 tonnes)

Hillside

100%

125

117

127

132

135

135

125

Bayside

100%

44

45

43

43

46

46

44

Alumar

46.3%

35

32

40

46

44

44

35

Valesul

45.5%

8

9

9

11

11

11

8

Mozal

47%

32

32

31

31

32

32

32

Total

244

235

250

263

268

268

244

BASE METALS (a)

COPPER

Payable metal in concentrate ('000 tonnes)

Escondida (b)

57.5%

89.3

80.1

75.3

94.4

68.4

68.4

89.3

Tintaya (b)

100%

20.9

22.9

0.8

0.2

-

-

20.9

Antamina (c)

33.8%

-

26.2

25.1

30.5

25.7

25.7

-

Alumbrera

25%

11.6

11.9

12.3

12.8

10.6

10.6

11.6

Highland Valley Copper

33.6%

16.1

15.6

14.2

16.1

14.9

14.9

16.1

Selbaie

100%

2.5

2.6

2.5

2.6

2.8

2.8

2.5

Total

140.4

159.3

130.3

156.6

122.4

122.4

140.4

Cathode ('000 tonnes)

Escondida

57.5%

21.9

21.9

21.2

21.5

17.9

17.9

21.9

Cerro Colorado

100%

34.3

33.8

31.3

31.3

32.5

32.5

34.3

Tintaya (b)

100%

-

-

-

1.3

8.4

8.4

-

San Manuel

100%

2.3

2.2

1.8

-

-

-

2.3

Pinto Valley

100%

3.4

3.4

3.1

2.8

2.8

2.8

3.4

Total

62.0

61.4

57.4

56.9

61.6

61.6

62.0

LEAD

Payable metal in concentrate (tonnes)

Cannington

100%

52,879

51,914

63,172

63,799

61,676

61,676

52,879

Pering

100%

1,153

1,288

892

969

1,567

1,567

1,153

Total

54,032

53,202

64,064

64,768

63,243

63,243

54,032

Refer footnotes on page 5.

BASE METALS (continued)

ZINC

Payable metal in concentate (tonnes)

Cannington

100%

14,058

17,285

15,002

12,511

15,182

15,182

14,058

Antamina (c)

33.8%

-

16,010

18,825

13,518

18,189

18,189

-

Selbaie

100%

9,684

7,896

8,495

8,121

9,840

9,840

9,684

Pering

100%

5,888

5,583

4,851

4,793

5,331

5,331

5,888

Total

29,630

46,774

47,174

38,942

48,542

48,542

29,630

GOLD

Payable metal in concentrate (ounces)

Escondida (b)

57.5%

10,641

12,166

11,837

17,694

10,074

10,074

10,641

Tintaya (b)

100%

10,249

11,500

503

-

-

-

10,249

Alumbrera

25%

42,584

49,780

49,064

51,511

39,279

39,279

42,584

Selbaie

100%

6,519

4,914

5,685

5,117

4,486

4,486

6,519

Highland Valley Copper

33.6%

1,235

1,178

1,126

1,268

1,314

1,314

1,235

Total

71,229

79,538

68,215

75,589

55,153

55,153

71,229

SILVER

Payable metal in concentrate ('000 ounces)

Cannington

100%

7,804

7,915

9,980

10,265

9,612

9,612

7,804

Escondida

57.5%

320

298

295

344

304

304

320

Antamina (c)

33.8%

-

690

565

512

595

595

-

Alumbrera

25.0%

42

71

68

56

53

53

42

Highland Valley Copper

33.6%

190

167

168

183

162

162

190

Selbaie

100%

384

662

504

524

593

593

384

Total

8,741

9,803

11,579

11,884

11,319

11,319

8,741

MOLYBDENUM

Payable metal in concentrate (tonnes)

Highland Valley Copper

33.6%

152

153

121

232

220

220

152

CARBON STEEL MATERIALS

IRON ORE

Production ('000 tonnes)

Mt Newman Joint Venture

85%

5,973

6,423

5,565

5,413

5,486

5,486

5,973

Goldsworthy Joint Venture

85%

1,656

1,667

1,434

1,690

1,891

1,891

1,656

Yandi Joint Venture

85%

7,046

6,933

6,614

6,663

7,796

7,796

7,046

Jimblebar

100%

1,182

1,332

1,211

1,476

1,370

1,370

1,182

Samarco

50%

1,223

928

1,640

1,838

1,925

1,925

1,223

Total

17,080

17,283

16,464

17,080

18,468

18,468

17,080

METALLURGICAL COAL (d)

Production ('000 tonnes)

CQCA Joint Venture

50%

4,002

3,908

5,156

5,001

4,156

4,156

4,002

South Blackwater (e)

50%

670

524

-

-

-

-

670

Gregory Joint Venture

50%

486

408

861

685

496

496

486

BHP Mitsui Coal (f)

80%

1,823

1,467

1,707

1,746

1,863

1,863

1,823

Illawarra

100%

2,055

1,841

1,265

1,927

2,135

2,135

2,055

Total

9,035

8,148

8,989

9,359

8,650

8,650

9,035

Refer footnotes on page 5.

CARBON STEEL MATERIALS (cont'd)

MANGANESE ORES

Saleable production ('000 tonnes)

South Africa (g)

60%

467

501

424

475

581

581

467

Australia (g)

60%

505

387

467

309

514

514

505

Total

972

888

891

784

1,095

1,095

972

MANGANESE ALLOYS

Saleable production ('000 tonnes)

South Africa (g)

60%

69

101

115

121

124

124

69

Australia (g)

60%

50

63

51

48

51

51

50

Total

119

164

166

169

175

175

119

HOT BRIQUETTED IRON

Production ('000 tonnes)

Boodarie™ Iron (h)

100%

386

384

277

-

333

333

386

DIAMONDS AND SPECIALTY PRODUCTS

DIAMONDS

Production ('000 carats)

Ekati™

80%

767

928

932

1,023

954

954

767

ENERGY COAL

Production ('000 tonnes)

South Africa

100%

14,538

13,724

13,633

13,815

13,838

13,838

14,538

USA

100%

3,106

3,170

3,266

3,703

2,905

2,905

3,106

Australia

100%

1,173

863

1,129

1,390

1,244

1,244

1,173

Indonesia (i)

80%

2,450

1,778

186

208

216

216

2,450

Colombia (j)

33%

1,138

1,088

1,022

1,455

1,231

1,231

1,138

Total

22,405

20,623

19,236

20,571

19,434

19,434

22,405

STAINLESS STEEL MATERIALS

NICKEL

Production ('000 tonnes)

CMSA

99.8%

9.6

10.4

10.5

9.9

11.7

11.7

9.6

Yabulu

100%

6.3

7.1

7.3

7.8

7.4

7.4

6.3

Total

15.9

17.5

17.8

17.7

19.1

19.1

15.9

CHROME ORES

Saleable production ('000 tonnes)

South Africa (g)

60%

629

609

549

664

713

713

629

FERROCHROME

Saleable production ('000 tonnes)

South Africa (g)

60%

207

206

201

223

238

238

207

Refer footnotes on page 5.

(a) Metal production is reported on the basis of payable metal.

(b) Sulphide production at Escondida and Tintaya was temporarily reduced in November 2001 and January 2002 respectively due to

weak market conditions. Commercial production of copper cathode commenced at Tintaya in June 2002.

(c) Antamina commenced commercial production in October 2001.

(d) Coal production is reported on the basis of saleable product. Production figures include some thermal coal.

(e) BHP Billiton acquired its share of South Blackwater in July 2001. South Blackwater is equally owned by BHP Billiton and

Mitsubishi Development Pty Ltd. Effective January 2002, South Blackwater production is reported in CQCA Joint Venture.

Production for the September 2001 quarter includes 775,000 tonnes sourced from South Blackwater which were not

reflected in financial results until the December 2001 quarter.

(f) Shown on 100% basis before 20% outside equity interest.

(g) Shown on 100% basis. BHP Billiton interest in saleable production is 60%.

(h) Boodarie™ Iron recommenced production in July 2002 following the suspension of operations due to a tube failure in a gas

re-heating furnace. The plant was progressively brought back on line with three trains operational at the end of the

September 2002 quarter.

(i) Production shown on 86.5% basis after allowing for Indonesian state owned corporation's 13.5% share of production.

BHP Billiton sold its interest in the Senakin and Satui mines effective 30 November 2001.

(j) BHP Billiton increased its interest in Cerrejon Zona Norte to 33.3% from 16.7% effective Februrary 2002.

PRODUCTION AND SHIPMENT REPORT

QUARTER ENDED

QUARTER ENDED

SEPT

DEC

MARCH

JUNE

SEPT

SEPT

SEPT

2001

2001

2002

2002

2002

2002

2001

PETROLEUM

BHP Billiton attributable production unless otherwise stated.

CRUDE OIL & CONDENSATE ('000 barrels)

Bass Strait

7,400

7,197

6,593

6,786

6,799

6,799

7,400

North West Shelf - condensate

1,331

1,310

1,525

1,466

1,602

1,602

1,331

North West Shelf - Wanaea/Cossack

1,652

1,919

1,851

1,892

1,876

1,876

1,652

Laminaria

3,001

2,569

1,958

2,200

2,914

2,914

3,001

Griffin

1,037

863

1,971

1,587

1,281

1,281

1,037

Pakistan

17

19

20

18

18

18

17

Typhoon (a)

835

1,443

1,507

1,754

1,233

1,233

835

Americas

918

810

917

861

718

718

918

Liverpool Bay

2,830

2,868

2,770

2,574

1,838

1,838

2,830

Bruce/Keith

483

640

532

594

271

271

483

Total

19,505

19,638

19,644

19,732

18,550

18,550

19,505

NATURAL GAS (billion cubic feet)

Bass Strait

29.76

23.14

17.18

26.77

33.07

33.07

29.76

North West Shelf - Domestic

3.68

3.73

3.45

2.86

3.62

3.62

3.68

North West Shelf - LNG

15.76

15.56

15.22

13.01

16.55

16.55

15.76

Griffin

1.45

1.25

0.92

0.34

0.95

0.95

1.45

Pakistan

2.66

2.83

2.94

3.02

2.83

2.83

2.66

Typhoon (a)

0.67

1.48

2.01

1.93

1.38

1.38

0.67

Americas

5.41

4.69

4.40

4.63

3.91

3.91

5.41

Bruce

3.28

10.65

8.44

7.92

4.59

4.59

3.28

Keith

0.19

0.27

0.11

0.16

0.07

0.07

0.19

Liverpool Bay

8.19

11.87

11.63

10.01

4.89

4.89

8.19

Total

71.05

75.47

66.30

70.66

71.86

71.86

71.05

LPG ('000 tonnes)

Bass Strait

128.73

107.80

108.47

126.70

149.66

149.66

128.73

North West Shelf

36.32

35.53

33.33

35.08

36.32

36.32

36.32

Bruce

16.51

28.50

18.73

17.49

22.45

22.45

16.51

Keith

1.36

1.18

0.67

1.17

0.53

0.53

1.36

Total

182.92

173.01

161.20

180.43

208.96

208.96

182.92

ETHANE ('000 tonnes)

24.05

18.59

18.87

25.62

27.67

27.67

24.05

(a) Typhoon commenced production in July 2001.

PRODUCTION AND SHIPMENT REPORT

QUARTER ENDED

QUARTER ENDED

SEPT

DEC

MARCH

JUNE

SEPT

SEPT

SEPT

2001

2001

2002

2002

2002

2002

2001

ALUMINIUM

BHP Billiton attributable production and sales unless otherwise stated.

('000 tonnes)

ALUMINA

Production

Worsley, Australia

662

671

677

686

698

698

662

Paranam, Suriname

219

209

208

215

221

221

219

Alumar, Brazil

83

85

111

117

112

112

83

Total

964

965

996

1,018

1,031

1,031

964

Sales

Worsley, Australia

692

638

656

690

758

758

692

Paranam, Suriname

224

221

205

197

253

253

224

Alumar, Brazil

79

88

101

106

130

130

79

Total

995

947

962

993

1,141

1,141

995

ALUMINIUM

Production

Hillside, South Africa

125

117

127

132

135

135

125

Bayside, South Africa

44

45

43

43

46

46

44

Alumar, Brazil

35

32

40

46

44

44

35

Valesul, Brazil

8

9

9

11

11

11

8

Mozal, Mozambique

32

32

31

31

32

32

32

Total

244

235

250

263

268

268

244

Sales

Hillside, South Africa

123

117

128

131

124

124

123

Bayside, South Africa

43

43

42

53

47

47

43

Alumar, Brazil

34

33

38

45

38

38

34

Valesul, Brazil

8

8

10

11

9

9

8

Mozal, Mozambique

32

32

31

34

27

27

32

Total

240

233

249

274

245

245

240

PRODUCTION AND SHIPMENT REPORT

QUARTER ENDED

QUARTER ENDED

SEPT

DEC

MARCH

JUNE

SEPT

SEPT

SEPT

2001

2001

2002

2002

2002

2002

2001

BASE METALS

BHP Billiton attributable production and sales unless otherwise stated. Metals production is payable metal unless otherwise stated.

Escondida, Chile (a)

Material mined (100%)

('000 tonnes)

85,344

84,821

80,401

77,244

74,671

74,671

85,344

Sulphide ore milled (100%)

('000 tonnes)

11,205

10,060

10,452

11,311

10,142

10,142

11,205

Average copper grade

(%)

1.75%

1.72%

1.53%

1.74%

1.45%

1.45%

1.75%

Production ex Mill (100%)

('000 tonnes)

162.0

144.4

134.9

170.3

125.6

125.6

162.0

Production

Payable copper

('000 tonnes)

89.3

80.1

75.3

94.4

68.4

68.4

89.3

Payable gold concentrate

(fine ounces)

10,641

12,166

11,837

17,694

10,074

10,074

10,641

Copper cathode (SXEW)

('000 tonnes)

21.9

21.9

21.2

21.5

17.9

17.9

21.9

Payable silver concentrate

('000 ounces)

320

298

295

344

304

304

320

Sales

Payable copper

('000 tonnes)

83.8

87.0

77.0

85.3

77.0

77.0

83.8

Payable gold concentrate

(fine ounces)

8,729

12,386

10,806

17,004

11,689

11,689

8,729

Copper cathode (SXEW)

('000 tonnes)

22.9

18.0

24.6

22.7

14.9

14.9

22.9

Payable silver concentrate

('000 ounces)

312

334

313

248

269

269

312

(a) Sulphide production at Escondida was temporarily reduced in November 2001 due to weak market conditions.

Tintaya, Peru (a) (b)

Material mined

('000 tonnes)

17,600

14,115

396

-

-

-

17,600

Ore milled

('000 tonnes)

1,640

1,569

71

-

-

-

1,640

Average copper grade

(%)

1.58%

1.72%

1.64%

0.00%

0.00%

0.00%

1.58%

Production

Payable copper

('000 tonnes)

20.9

22.9

0.8

0.2

-

-

20.9

Payable gold concentrate

(fine ounces)

10,249

11,500

503

-

-

-

10,249

Copper cathode (SXEW)

('000 tonnes)

1.3

8.4

8.4

-

Sales

Payable copper

('000 tonnes)

19.2

17.8

8.8

-

-

-

19.2

Payable gold concentrate

(fine ounces)

9,745

9,546

5,452

212

-

-

9,745

Copper cathode (SXEW)

('000 tonnes)

1.9

8.0

8.0

-

(a) Sulphide production at Tintaya was temporarily suspended in January 2002 due to weak market conditions.

(b) Commercial production of copper cathode commenced in June 2002.

Cerro Colorado, Chile

Material mined

('000 tonnes)

13,595

16,677

15,348

18,628

17,963

17,963

13,595

Ore milled

('000 tonnes)

3,516

3,864

3,698

3,581

3,759

3,759

3,516

Average copper grade

(%)

1.06%

1.13%

1.03%

1.00%

0.97%

0.97%

1.06%

Production

Copper cathode

('000 tonnes)

34.3

33.8

31.3

31.3

32.5

32.5

34.3

Sales

Copper cathode

('000 tonnes)

33.8

31.7

33.9

34.5

21.2

21.2

33.8

Antamina, Peru (a)

Material mined (100%)

('000 tonnes)

19,970

20,548

28,990

30,235

30,235

-

Ore milled (100%)

('000 tonnes)

6,318

6,309

7,250

6,794

6,794

-

Average head grades

- Copper

(%)

1.42%

1.31%

1.43%

1.36%

1.36%

0.00%

- Zinc

(%)

1.35%

1.44%

0.93%

1.66%

1.66%

0.00%

Production

Payable copper

('000 tonnes)

26.2

25.1

30.5

25.7

25.7

-

Payable zinc

(tonnes)

16,010

18,825

13,518

18,189

18,189

-

Payable silver

('000 ounces)

690

565

512

595

595

-

Sales

Payable copper

('000 tonnes)

28.7

28.8

28.6

30.6

30.6

-

Payable zinc

(tonnes)

9,283

23,028

15,009

19,184

19,184

-

Payable silver

('000 ounces)

748

595

489

590

590

-

(a) Commercial production commenced in October 2001.

Alumbrera, Argentina

Material mined (100%)

('000 tonnes)

29,545

28,635

25,430

26,524

29,356

29,356

29,545

Ore milled (100%)

('000 tonnes)

7,516

7,142

7,146

7,575

8,034

8,034

7,516

Average head grades

- Copper

(%)

0.70%

0.74%

0.76%

0.73%

0.62%

0.62%

0.70%

- Gold

(g/t)

1.0

1.1

1.1

1.0

0.8

0.8

1.0

Production

Payable copper

('000 tonnes)

11.6

11.9

12.3

12.8

10.6

10.6

11.6

Payable gold

(fine ounces)

40,370

46,987

45,421

46,537

35,935

35,935

40,370

Payable gold - dore

(fine ounces)

2,214

2,793

3,644

4,973

3,344

3,344

2,214

Payable silver

('000 ounces)

42

71

68

56

53

53

42

Sales

Payable copper

('000 tonnes)

9.8

13.1

12.7

11.6

10.3

10.3

9.8

Payable gold

(fine ounces)

34,461

48,223

47,261

36,874

33,707

33,707

34,461

Payable gold - dore

(fine ounces)

2,009

1,829

3,710

4,466

3,082

3,082

2,009

Payable silver

('000 ounces)

42

71

67

56

53

53

42

Highland Valley Copper, Canada

Material mined (100%)

('000 tonnes)

19,910

20,883

18,322

18,522

20,455

20,455

19,910

Ore milled (100%)

('000 tonnes)

12,841

12,912

11,778

12,224

12,941

12,941

12,841

Average copper grade

(%)

0.43%

0.42%

0.42%

0.43%

0.40%

0.40%

0.43%

Production

Payable copper

('000 tonnes)

16.1

15.6

14.2

16.1

14.9

14.9

16.1

Payable molybdenum

('000 tonnes)

0.15

0.15

0.12

0.23

0.22

0.22

0.15

Payable silver

('000 ounces)

190

167

168

183

162

162

190

Payable gold concentrate

(fine ounces)

1,235

1,178

1,126

1,268

1,314

1,314

1,235

Sales

Payable copper

('000 tonnes)

17.5

18.8

11.6

14.9

14.4

14.4

17.5

Payable molybdenum

('000 tonnes)

0.14

0.14

0.17

0.22

0.19

0.19

0.14

Payable silver

('000 ounces)

204

219

133

173

153

153

204

Payable gold concentrate

(fine ounces)

1,840

2,062

1,096

1,467

1,240

1,240

1,840

Cannington, Australia

Material mined

('000 tonnes)

543

555

569

574

631

631

543

Ore milled

('000 tonnes)

496

538

567

575

599

599

496

Average head grades

- Silver

(g/t)

598

567

619

675

564

564

598

- Lead

(%)

13.2%

12.1%

12.7%

13.6%

11.7%

11.7%

13.2%

- Zinc

(%)

4.8%

5.3%

4.6%

3.9%

4.3%

4.3%

4.8%

Production

Payable silver

('000 ounces)

7,804

7,915

9,980

10,265

9,612

9,612

7,804

Payable lead

(tonnes)

52,879

51,914

63,172

63,799

61,676

61,676

52,879

Payable zinc

(tonnes)

14,058

17,285

15,002

12,511

15,182

15,182

14,058

Sales

Payable silver

('000 ounces)

7,231

8,045

9,383

10,788

9,376

9,376

7,231

Payable lead

(tonnes)

49,423

52,577

59,712

67,650

59,871

59,871

49,423

Payable zinc

(tonnes)

13,220

17,850

19,105

14,761

12,107

12,107

13,220

Selbaie, Canada

Ore milled

('000 tonnes)

1,006

1,029

1,012

1,016

1,049

1,049

1,006

Average head grades

- Zinc

(%)

1.51%

1.29%

1.32%

1.26%

1.37%

1.37%

1.51%

- Copper

(%)

0.34%

0.34%

0.33%

0.34%

0.33%

0.33%

0.34%

- Gold

(g/t)

0.34

0.24

0.26

0.25

0.23

0.23

0.34

- Silver

(g/t)

25.00

37.23

29.10

28.99

35.10

35.10

25.00

Production

Payable zinc

(tonnes)

9,684

7,896

8,495

8,121

9,840

9,840

9,684

Payable copper

(tonnes)

2,477

2,616

2,452

2,642

2,789

2,789

2,477

Payable gold concentrate

(ounces)

6,519

4,914

5,685

5,117

4,486

4,486

6,519

Payable silver

('000 ounces)

384

662

504

524

593

593

384

Sales

Payable zinc

(tonnes)

9,959

7,932

8,400

7,877

9,861

9,861

9,959

Payable copper

(tonnes)

3,196

2,615

2,605

2,459

2,823

2,823

3,196

Payable gold concentrate

(ounces)

8,112

8,002

5,048

5,142

5,932

5,932

8,112

Payable silver

('000 ounces)

284

321

605

573

527

527

284

Pering, South Africa

Ore milled

('000 tonnes)

339

342

330

338

320

320

339

Average head grades

- Zinc

(%)

2.02%

1.90%

1.73%

1.85%

2.21%

2.21%

2.02%

- Lead

(%)

0.49%

0.54%

0.42%

0.52%

0.66%

0.66%

0.49%

Production

Payable zinc

(tonnes)

5,888

5,583

4,851

4,793

5,331

5,331

5,888

Payable lead

(tonnes)

1,153

1,288

892

969

1,567

1,567

1,153

Sales

Payable zinc

(tonnes)

4,932

4,859

4,745

3,667

3,701

3,701

4,932

Payable lead

(tonnes)

1,366

1,217

1,298

729

1,367

1,367

1,366

San Manuel, USA (a)

Production

Copper cathode (SXEW)

('000 tonnes)

2.3

2.2

1.8

-

-

-

2.3

(a) San Manuel SXEW operations closed in March 2002.

Pinto Valley, USA

Production

Copper cathode (SXEW)

('000 tonnes)

3.4

3.4

3.1

2.8

2.8

2.8

3.4

Sales

Copper cathode (SXEW)

('000 tonnes)

3.1

2.3

4.4

2.9

2.7

2.7

3.1

PRODUCTION AND SHIPMENT REPORT

QUARTER ENDED

QUARTER ENDED

SEPT

DEC

MARCH

JUNE

SEPT

SEPT

SEPT

2001

2001

2002

2002

2002

2002

2001

CARBON STEEL MATERIALS

BHP Billiton attributable production and sales unless otherwise stated.

('000 tonnes)

Figures in italics indicate adjustments have been made since the data was

IRON ORE (a)

previously reported.

Pilbara, Australia

Production

Mt Newman Joint Venture

5,973

6,423

5,565

5,413

5,486

5,486

5,973

Goldsworthy Joint Venture (b)

1,656

1,667

1,434

1,690

1,891

1,891

1,656

Yandi Joint Venture

7,046

6,933

6,614

6,663

7,796

7,796

7,046

Jimblebar

1,182

1,332

1,211

1,476

1,370

1,370

1,182

Total (BHP Billiton share)

15,858

16,355

14,824

15,242

16,543

16,543

15,858

Total production (100%)

18,448

19,006

17,226

17,671

19,221

19,221

18,448

Shipments

Lump

3,729

3,483

3,316

4,151

4,335

4,335

3,729

Fines

12,334

12,025

11,083

10,517

11,842

11,842

12,334

Total (BHP Billiton share)

16,063

15,508

14,399

14,668

16,177

16,177

16,063

Total shipments (100%)

18,897

18,245

16,940

17,256

19,033

19,033

18,897

(a) Iron ore production and shipments are reported on a wet tonnes basis.

(b) Includes bulk sample production from Mining Area C.

Samarco, Brazil

Production

1,223

928

1,640

1,838

1,925

1,925

1,223

Shipments

1,156

1,440

1,705

1,768

2,014

2,014

1,156

METALLURGICAL COAL (a)

Queensland, Australia

Production

CQCA Joint Venture

Blackwater

977

1,305

1,892

1,669

1,633

1,633

977

Goonyella

986

850

1,036

904

734

734

986

Peak Downs

885

730

1,028

1,185

789

789

885

Saraji

627

528

676

716

427

427

627

Norwich Park

527

495

524

527

573

573

527

CQCA total

4,002

3,908

5,156

5,001

4,156

4,156

4,002

South Blackwater (b)

670

524

-

-

-

-

670

Gregory Joint Venture

486

408

861

685

496

496

486

BHP Mitsui Coal (c)

Riverside

917

649

907

928

927

927

917

South Walker Creek

906

817

800

818

936

936

906

BHP Mitsui Coal total

1,823

1,467

1,707

1,746

1,863

1,863

1,823

Queensland total

6,980

6,307

7,724

7,432

6,515

6,515

6,980

Shipments (d)

Coking coal

4,804

4,011

4,799

5,252

4,165

4,165

4,804

Weak coking coal

1,592

1,674

1,604

1,124

1,739

1,739

1,592

Thermal coal

631

704

764

734

1,022

1,022

631

Total

7,027

6,390

7,167

7,110

6,926

6,926

7,027

(a) Coal production is reported on the basis of saleable product. Production figures include some thermal coal.

(b) BHP Billiton acquired its share of South Blackwater in July 2001. South Blackwater is equally owned by BHP Billiton and

Mitsubishi Development Pty Ltd. Effective Jauary 2002, South Blackwater production is included in Blackwater.

(c) BHP Mitsui Coal production shown on 100% basis before 20% outside equity interest.

(d) Shipment totals for the September 2001 quarter includes 775,000 tonnes sourced from South Blackwater which were not

reflected in financial results until the December 2001 quarter.

Illawarra, Australia

Production

2,055

1,841

1,265

1,927

2,135

2,135

2,055

Shipments

Coking coal

1,457

1,655

1,555

1,543

1,515

1,515

1,457

Thermal coal

136

94

49

268

134

134

136

Total

1,593

1,749

1,604

1,811

1,649

1,649

1,593

MANGANESE ORES

South Africa

Saleable production (a)

467

501

424

475

581

581

467

(a) Shown on 100% basis, BHP Billiton interest in saleable production is 60%.

Australia

Saleable production (a)

505

387

467

309

514

514

505

(a) Shown on 100% basis, BHP Billiton interest in saleable production is 60%.

MANGANESE ALLOYS

South Africa

Saleable production (a)

69

101

115

121

124

124

69

(a) Shown on 100% basis, BHP Billiton interest in saleable production is 60%.

Australia

Saleable production (a)

50

63

51

48

51

51

50

(a) Shown on 100% basis, BHP Billiton interest in saleable production is 60%.

HOT BRIQUETTED IRON

Boodarie™ Iron, Australia (a)

Production

386

384

277

-

333

333

386

Shipments

358

302

391

93

202

202

358

(a) Boodarie™ Iron recommenced production in July 2002 following the suspension of operations due to a tube failure in a gas

re-heating furnace. The plant was progressively brought back on line with three trains operational at the end of the

September 2002 quarter.

PRODUCTION AND SHIPMENT REPORT

QUARTER ENDED

QUARTER ENDED

SEPT

DEC

MARCH

JUNE

SEPT

SEPT

SEPT

2001

2001

2002

2002

2002

2002

2001

DIAMONDS AND SPECIALTY PRODUCTS

BHP Billiton attributable production and sales unless otherwise stated.

DIAMONDS

Ekati™, Canada

Production

('000 carats)

767

928

932

1,023

954

954

767

PRODUCTION AND SHIPMENT REPORT

QUARTER ENDED

QUARTER ENDED

SEPT

DEC

MARCH

JUNE

SEPT

SEPT

SEPT

2001

2001

2002

2002

2002

2002

2001

ENERGY COAL

BHP Billiton attributable production and sales unless otherwise stated.

('000 tonnes)

Ingwe, South Africa

Production

14,538

13,724

13,633

13,815

13,838

13,838

14,538

Sales

Export

6,289

6,083

5,605

5,744

5,648

5,648

6,289

Local utility

7,477

6,780

6,979

7,767

7,836

7,836

7,477

Inland

1,092

1,111

835

742

471

471

1,092

Total

14,858

13,974

13,418

14,253

13,955

13,955

14,858

New Mexico, USA

Production

Navajo Coal

1,694

1,682

1,801

2,030

1,602

1,602

1,694

San Juan Coal

1,412

1,488

1,465

1,673

1,303

1,303

1,412

Total

3,106

3,170

3,266

3,703

2,905

2,905

3,106

Sales - local utility

3,407

3,489

2,882

3,469

3,546

3,546

3,407

Hunter Valley, Australia

Production

1,173

863

1,129

1,390

1,244

1,244

1,173

Sales

Export

604

571

904

1,056

783

783

604

Inland

398

378

342

337

366

366

398

Total

1,002

949

1,246

1,393

1,149

1,149

1,002

Kalimantan, Indonesia

Production (a)

Senakin (b)

1,161

801

-

-

-

-

1,161

Satui (b)

1,068

777

-

-

-

-

1,068

Petangis

221

201

186

208

216

216

221

Total

2,450

1,778

186

208

216

216

2,450

Sales - export

2,312

1,684

242

243

189

189

2,312

(a) Reported on 86.5% basis after allowing for the Indonesian state-owned corporation's 13.5% share of all production.

(b) BHP Billiton sold its interest in Senakin and Satui effective 30 November 2001.

Cerrejon Coal, Colombia (a)

Production

1,138

1,088

1,022

1,455

1,231

1,231

1,138

Sales - export

1,098

688

971

1,144

1,246

1,246

1,098

(a) BHP Billiton increased its interest in CZN from 16.7% to 33.3% effective February 2002.

PRODUCTION AND SHIPMENT REPORT

QUARTER ENDED

QUARTER ENDED

SEPT

DEC

MARCH

JUNE

SEPT

SEPT

SEPT

2001

2001

2002

2002

2002

2002

2001

STAINLESS STEEL MATERIALS

BHP Billiton attributable production and sales unless otherwise stated.

('000 tonnes)

NICKEL

CMSA, Colombia

Production

9.6

10.4

10.5

9.9

11.7

11.7

9.6

Sales

9.1

10.4

10.5

11.6

10.5

10.5

9.1

Yabulu, Australia

Production

Nickel

6.3

7.1

7.3

7.8

7.4

7.4

6.3

Cobalt

0.4

0.4

0.5

0.4

0.5

0.5

0.4

Sales

Nickel

7.7

6.9

7.3

7.1

7.1

7.1

7.7

Cobalt

0.4

0.5

0.5

0.5

0.5

0.5

0.4

CHROME ORES

South Africa

Saleable production (a)

629

609

549

664

713

713

629

(a) Shown on 100% basis, BHP Billiton interest in saleable production is 60%.

FERROCHROME

South Africa

Saleable production (a)

207

206

201

223

238

238

207

(a) Shown on 100% basis, BHP Billiton interest in saleable production is 60%.

 

BHP Billiton Limited ABN 49 004 028 077
Registered in Australia
Registered Office: 600 Bourke Street Melbourne Victoria 3000
Telephone +61 3 9609 3333 Facsimile +61 3 9609 3015

BHP Billiton Plc Registration number 3196209
Registered in England and Wales
Registered Office: 1-3 Strand London WC2N 5HA United Kingdom
Telephone +44 20 7747 3800 Facsimile +44 20 7747 3900

The BHP Billiton Group is headquartered in Australia